Skip to main content

First all-electric car-sharing scheme in North America to launch

ECOtality has announced a partnership with Car2go, a subsidiary of Daimler North America Corporation, to provide electric vehicle charging infrastructure to support what is being claimed as the first 100-per cent electric car sharing programme in North America. With plans for approximately 300 Smart Fortwo electric drive vehicles, the programme in San Diego represents the largest fleet of EVs in the United States.
April 19, 2012 Read time: 2 mins
RSS276 ECOtality has announced a partnership with 4190 Car2go, a subsidiary of 2069 Daimler North America Corporation, to provide electric vehicle charging infrastructure to support what is being claimed as the first 100-per cent electric car sharing programme in North America. With plans for approximately 300 Smart Fortwo electric drive vehicles, the programme in San Diego represents the largest fleet of EVs in the United States.

“Innovative car-sharing programmes like Car2go’s service are pivotal to encouraging the mainstream adoption of electric vehicles,” said Jonathan Read, CEO of ECOtality. “As we deploy approximately 1,000 Blink charging stations in the San Diego region as part of The EV Project, we are creating the robust public infrastructure necessary for Car2go’s programme to succeed. Together, we will show that EVs are a perfect fit for the lifestyle of San Diego drivers.”

Car2go’s all-electric programme will begin in San Diego in late 2011. The company provides a total of more than 40,000 members with more than 1,000 low-emission smart fortwo vehicles in four cities.
ECOtality is currently installing approximately 1,000 publicly available Blink charging stations throughout the San Diego region as part of ‘The EV Project’. Data collected by the charging stations will be analysed to better understand how EV drivers charge their car, and help to guide future rollouts of commercial charging stations.

ECOtality is the project manager of The EV Project and will oversee the installation of approximately 14,000 commercial and residential charging stations in 18 major cities and metropolitan areas in six states and the District of Columbia. The project will provide an EV infrastructure to support the deployment of 8,300 EVs. The project is a public-private partnership, funded in part by the U.S. Department of Energy through a federal stimulus grant and made possible by the American Recovery and Reinvestment Act (ARRA).

For more information on companies in this article

Related Content

  • Iteris wins $1.4 million signal system management project
    November 6, 2014
    Iteris is to serve as system manager for the deployment of the City of Omaha’s Intelligent Transportation System (ITS). The US $1.4 million project builds upon Omaha’s Traffic Signal System Master Plan, developed by Iteris in 2012, and will include the management of Omaha’s $35 million ITS upgrade program to reduce congestion. As system manager, Iteris will oversee the enhancements to the transportation network, focusing on more than 1,000 traffic signals and 4,500 miles of roadway in the city. Iteris’ r
  • Study in Finland shows infrastructure is a good investment
    March 28, 2012
    VTT Technical Research Centre of Finland, the University of Oulu and Aalto University in Finland have analysed the financial statements for 2002-2009 of companies, public utilities, and municipal units that own infrastructure, including water services, as well as road, port, airport, railway and electricity networks. Owning infrastructure is relatively risk-free. The most profitable is the energy sector where the return on investment was about 13%. The average annual return on investment of ports was 10%. T
  • Q-Free increases its stake in Intelight
    March 20, 2015
    Q-Free has increased its stake in US traffic controller supplier, Intelight, with a five year option program which will give shareholders the option to sell shares at closing in 2015 and in five subsequent years valid from 2016. The deal will give Q-Free the opportunity to add some 15 per cent of Intelight shares to its current 10.2 per cent shareholding each year. At end of the five year period, Q-Free has the option to acquire the rest of the shares. The first transaction will be closed during the second
  • Signal optimisation reduces congestion, improves travel times
    February 2, 2012
    The Metropolitan Government of Nashville and Davidson County's Department of Public Works(MPW) identified seven corridors in the County that experience heavy traffic congestion and needed traffic signal timing improvements to improve traffic flow as well as air quality and fuel consumption. The seven corridors included a total of 223 signalised intersections. To conduct this study, termed the Traffic Signal Optimisation Study for the Metro Nashville Signal System, MPW received funding from the Federal Conge