Skip to main content

Ficosa shows off new e-mobility development centre

Spanish firm Ficosa has pulled back the curtain on its new centre for developing electromobility solutions. The €10 million, 1,200-m2 ‘e-mobility hub’ near Barcelona in Spain, currently contains four new labs and will be the location for developing and manufacturing software and hardware solutions for hybrid and electric vehicles, specifically battery-management systems and on-board chargers. It is home to 120 engineers, and the company says it will take on 100 more in 2019, as well as adding a new
October 11, 2018 Read time: 2 mins

Spanish firm Ficosa has pulled back the curtain on its new centre for developing electromobility solutions.

The €10 million, 1,200-m2 ‘e-mobility hub’ near Barcelona in Spain, currently contains four new labs and will be the location for developing and manufacturing software and hardware solutions for hybrid and electric vehicles, specifically battery-management systems and on-board chargers.

It is home to 120 engineers, and the company says it will take on 100 more in 2019, as well as adding a new laboratory, increasing the hub’s footprint by 750 m2.

Ficosa CEO Javier Pujol called it a “huge milestone” for the company: “It puts us on the leading edge of the revolution that electric mobility is bringing about in the sector with a cutting-edge centre at a global level.”

The company also has hubs for connectivity and safety at the same location in Viladecavalls. “The Viladecavalls centre has positioned itself as one of the most cutting-edge in the world in vision, e-mobility, connectivity and safety technology, and is, without a doubt, the driving force for the whole technological transformation Ficosa has undergone in recent years,” Pujol adds.

Earlier this year, Ficosa became part of a major Panasonic project to bring cellular-vehicle-to-everything (C-V2X) technologies to Colorado, supplying C-V2X on-board units.

A fleet of Ford utility vehicles is equipped with C-V2X devices that utilise Ficosa’s CarCom platform to enable vehicle-to-vehicle and vehicle-to-infrastructure direct communications.

Related Content

  • Peachtree installs solar roadway system
    December 15, 2020
    US city's solution will produce more than 1,300 kilowatt-hours of electricity a year
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of
  • Nairobi looks to ITS to ease travel problems
    December 21, 2017
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of adequate traffic management systems and poor utilisation of existing road facilities.