Skip to main content

Ficosa shows off new e-mobility development centre

Spanish firm Ficosa has pulled back the curtain on its new centre for developing electromobility solutions. The €10 million, 1,200-m2 ‘e-mobility hub’ near Barcelona in Spain, currently contains four new labs and will be the location for developing and manufacturing software and hardware solutions for hybrid and electric vehicles, specifically battery-management systems and on-board chargers. It is home to 120 engineers, and the company says it will take on 100 more in 2019, as well as adding a new
October 11, 2018 Read time: 2 mins

Spanish firm Ficosa has pulled back the curtain on its new centre for developing electromobility solutions.

The €10 million, 1,200-m2 ‘e-mobility hub’ near Barcelona in Spain, currently contains four new labs and will be the location for developing and manufacturing software and hardware solutions for hybrid and electric vehicles, specifically battery-management systems and on-board chargers.

It is home to 120 engineers, and the company says it will take on 100 more in 2019, as well as adding a new laboratory, increasing the hub’s footprint by 750 m2.

Ficosa CEO Javier Pujol called it a “huge milestone” for the company: “It puts us on the leading edge of the revolution that electric mobility is bringing about in the sector with a cutting-edge centre at a global level.”

The company also has hubs for connectivity and safety at the same location in Viladecavalls. “The Viladecavalls centre has positioned itself as one of the most cutting-edge in the world in vision, e-mobility, connectivity and safety technology, and is, without a doubt, the driving force for the whole technological transformation Ficosa has undergone in recent years,” Pujol adds.

Earlier this year, Ficosa became part of a major Panasonic project to bring cellular-vehicle-to-everything (C-V2X) technologies to Colorado, supplying C-V2X on-board units.

A fleet of Ford utility vehicles is equipped with C-V2X devices that utilise Ficosa’s CarCom platform to enable vehicle-to-vehicle and vehicle-to-infrastructure direct communications.

Related Content

  • AVERE slams EU Council CO2 position
    October 12, 2018
    Electromobility trade association AVERE has slammed a key European Union Council position on future CO2 emissions in cars. AVERE says the stance agreed this week by EU environment ministers “falls short in providing the e-mobility sector with right signals to support the e-mobility transition”. The Council has suggested that cars should put out 35% less CO2 by 2030 compared to 2020 – but just last week MEPs called for a 40% cut. This means that EU states have chosen “to support and prop up old business m
  • MaaS is at the ‘baby steps’ stage – but needs to get up and running soon
    April 16, 2018
    Data sharing between organisations remains a potential problem for Mobility as a Service projects, attendees at February's MaaS Market conference in London were told. Alan Dron listens in on the presentations.
  • UK Government funding for plug-in vehicle infrastructure
    February 27, 2015
    A wave of charge-points to support the fast-growing popularity of plug-in vehicles will be installed across the UK after the government set out US$49 million of infrastructure support up to 2020. Homes, hospitals, train stations and A-roads will be some of the locations for further charge-points to maintain Britain’s position as a global leader in this cutting-edge technology. The support compliments the fast-growing popularity of ultra low emission vehicles (ULEVs) with grant claims rising four-fold in 20
  • Michigan fosters real-world testing of workzone ITS
    September 19, 2017
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in