Skip to main content

Extended EV charging infrastructure launched

UK city Corby is aiming to be a leading edge business location, with the launch of an extended electric vehicle (EV) charging infrastructure. To complement the EV charge points already at Corby Station and the Corby Cube, charge points have been installed at a range of venues and businesses including the Holiday Inn, Adrenaline Alley and Corby Town Football Club. Corby now has one of the highest concentrations of charge points per head of population in the UK.
September 12, 2013 Read time: 2 mins
UK city Corby is aiming to be a leading edge business location, with the launch of an extended electric vehicle (EV) charging infrastructure.  To complement the EV charge points already at Corby Station and the Corby Cube, charge points have been installed at a range of venues and businesses including the Holiday Inn, Adrenaline Alley and Corby Town Football Club.

Corby now has one of the highest concentrations of charge points per head of population in the UK.

With 100 per cent funding from a combination of the European Regional Development Fund and 1837 Department for Transport, Corby now has 21 charging points across the Borough, including one of the latest Quick Chargers that can recharge some EVs in as little as twenty minutes.

The network of EV charge points in Corby is part of a wider ‘Plugged in Midlands’ and a growing national network of chargers that are aimed at encouraging and supporting the emerging market for electric cars and light goods vehicles.

Nick Bolton, Electric Corby project manager said “Electric and hybrid electric vehicles will play a growing part in the future of transport in the UK. We have now extended the number of public access charge points in Corby and we are also supporting local businesses keen to be part of the growth in cleaner more efficient vehicle technologies by putting the necessary charging infrastructure in place.”

Leader of Corby Borough Council, Councillor Tom Beattie, said “We are delighted to be in a position to work with 189 Siemens and Electric Corby on this project which will complement the public charging points the Borough Council has already installed at The Cube, Rail Station and Corby Enterprise Centre.”

Mark Bonnor-Morris, head of Electro Mobility, UK and Ireland Siemens said: “We fully support the innovative approach being made by Electric Corby and Corby Borough Council to the future transportation needs in the area and the promotion of electric vehicles to local commerce. This landmark project demonstrates transition from low-power (‘trickle’) on-street electric vehicle charging to high-power and rapid industry-grade facilities based at work premises, increasing investment and the utilisation of electric vehicles.”

An online map showing the latest locations is available at %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal www.electriccorby.co.uk www.electriccorby.co.uk false http://www.electriccorby.co.uk/ false false%>.

Related Content

  • October 2, 2012
    Driving innovation at Road Expo 2012
    Road Expo, Scotland's largest traffic management and highway maintenance event, opens on 7– 8 November 2012 at the Royal Highland Centre, Edinburgh. Road Expo provides road professionals with the opportunity to see the latest technology and get to grips with the implications of legislative changes. The 2012 show will be packed with features offering visitors the opportunity to network with peers, exchange ideas and discover ways to increase efficiency and reduce costs. Over one hundred leading suppliers i
  • November 10, 2015
    California Road Charge Pilot Project – request for proposals
    D’Artagnan Consulting has been retained by California Department of Transportation (Caltrans) as the prime contractor to assist the Caltrans with formulation, design, management and implementation of the California Road Charge Pilot Program. A key element of the program is the California Road Charge Pilot Project, which will demonstrate and evaluate an operational road charge system with 5000 volunteer vehicles from summer 2016 to spring 2017.
  • February 28, 2013
    ITS America concerned over use of 5GHz spectrum band
    ITS America has raised con­cerns with the US Federal Communications Commission (FCC) over the potential use of the 5GHz band spec­trum by unlicensed national information infrastructure devices. It wants to protect the 5.9GHz band for dedicated short-range communications (DSRC)-based systems. These crucially underpin the development of connected vehicle (CV) technologies which could help slash the US’ annual tally of six million road traffic accidents and over 30,000 deaths. Within the US Department of Trans
  • April 22, 2013
    Open Roads updates Alaska’s 511 website and wins Virginia contract
    Open Roads and the Alaska Department of Transportation and Public Facilities (DOT&PF) have introduced a new version of the 511 Traveler Information Website