Skip to main content

Evolt completes rapid charging network in Scotland

Evolt, a member of the Swarco group, has completed the supply and installation of a new network of seven rapid and two fast chargers (EV) charge points on the Western Scotland mainland and the Isle of Mull, on behalf of Argyll and Bute Council. The new network is Council’s first publicly available EV charging infrastructure, funded by Transport Scotland through a Government-led initiative that helps to promote the use of EVs in Scotland. Seven of Evolt’s top-of-the-range rapid chargers that can effici
July 15, 2016 Read time: 2 mins
Evolt, a member of the 129 Swarco group, has completed the supply and installation of a new network of seven rapid and two fast chargers (EV) charge points on the Western Scotland mainland and the Isle of Mull, on behalf of Argyll and Bute Council.

The new network is Council’s first publicly available EV charging infrastructure, funded by 505 Transport Scotland through a Government-led initiative that helps to promote the use of EVs in Scotland.

Seven of Evolt’s top-of-the-range rapid chargers that can efficiently charge two EVs to 80 per cent of their battery life within 30 minutes through a 50Kw AC and 43Kw DC outlet have been installed throughout the region, including two on Mull. These are supplemented by two 22kW Fast chargers that are ideal for quick ‘top ups’, have AC and DC capability, and take one hour to simultaneously charge two EVs. Each unit has a built in 3G communications modem enabling Evolt’s back office management system to remotely monitor the charging process and collect and provide charging data when needed.

Related Content

  • February 26, 2016
    New charging network brings electric motoring to UK drivers
    The completion of a new charging network that stretches the length of Britain’s busiest roads makes long-distance, cross-border journeys by electric vehicles (EV) a realistic prospect for millions more drivers in the UK and Ireland. The network stretches from Stranraer in Scotland to Suffolk in the East of England, from Hull in the North East to Holyhead in north-west Wales, connecting with Belfast in Northern Ireland and Dublin in the Republic of Ireland. Each installation includes at least two of t
  • December 19, 2014
    Siemens delivers complete EV infrastructure packages
    Siemens is delivering electric vehicle (EV) rapid charging networks across the UK, including networks consisting of almost forty QC45 multi-standard EV chargers to be supplied and installed in South Tyneside and Dorset early in 2015. The networks will be connected to Charge-Your-Car Back Office , and include three years maintenance support provided by Siemens. Funded by the Office for Low Emission Vehicles (OLEV), the network in South Tyneside will consist of twenty QC45 triple-outlet, rapid chargers.
  • April 8, 2015
    Siemens unveils new EV charging solutions at Traffex
    Siemens is to launch new DC rapid electric vehicle (EV) charger at Traffex 2015, complementing the company’s proven range of electric vehicle (EV) charging solutions. Designed to conform to all industry standard charging protocols and interfaces, the new single-outlet, wall-mounted QC24S rapid charger provides a DC output at 24kW and can be supplied with a CCS or CHadeMO connector on a tethered lead, capable of charging all compatible vehicles. Charging from zero to 80 per cent in less than 60 minute
  • March 13, 2017
    First eVolt charge point installed for Electric Nation
    The first eVolt smart electric vehicle (EV) charge point has been installed at a residential property outside Nottingham for the Electric Nation trial, which is seeking to find a smart charging solution that will better manage local level power distribution at peak times. According to eVolt, the eMobility brand of the Swarco Group, research suggests that some of the UK’s local electricity networks will need intervention to enable motorists to charge EVs at home at peak times. It indicates that at least U