Skip to main content

Evolt completes rapid charging network in Scotland

Evolt, a member of the Swarco group, has completed the supply and installation of a new network of seven rapid and two fast chargers (EV) charge points on the Western Scotland mainland and the Isle of Mull, on behalf of Argyll and Bute Council. The new network is Council’s first publicly available EV charging infrastructure, funded by Transport Scotland through a Government-led initiative that helps to promote the use of EVs in Scotland. Seven of Evolt’s top-of-the-range rapid chargers that can effici
July 15, 2016 Read time: 2 mins
Evolt, a member of the 129 Swarco group, has completed the supply and installation of a new network of seven rapid and two fast chargers (EV) charge points on the Western Scotland mainland and the Isle of Mull, on behalf of Argyll and Bute Council.

The new network is Council’s first publicly available EV charging infrastructure, funded by 505 Transport Scotland through a Government-led initiative that helps to promote the use of EVs in Scotland.

Seven of Evolt’s top-of-the-range rapid chargers that can efficiently charge two EVs to 80 per cent of their battery life within 30 minutes through a 50Kw AC and 43Kw DC outlet have been installed throughout the region, including two on Mull. These are supplemented by two 22kW Fast chargers that are ideal for quick ‘top ups’, have AC and DC capability, and take one hour to simultaneously charge two EVs. Each unit has a built in 3G communications modem enabling Evolt’s back office management system to remotely monitor the charging process and collect and provide charging data when needed.

Related Content

  • April 19, 2021
    Siemens supports Rome EV-sharing 
    Siemens Smart Infrastructure providing start-up electric vehicle firm On with charge stations
  • February 22, 2017
    Swarco on display at Parkex 2017
    Swarco Parking & eMobility UK is exhibiting its range of business enabling solutions and software developed for the connected world from three of its business units at Parkex 2017. APT Skidata will demonstrate its SwappAccess mobile App that enables customers to plan, park and pay for on or off-street parking, along with SWEB.Validate, an electronic validation management hosted service. For system operators, it will showcase INS Reporting, the latest cloud-based reporting and management information syste
  • October 4, 2017
    RAC Foundation: National charge point network needed for electric vehicles
    Potential purchases of electric vehicles with have limited widespread impact without a national charge point network, particularly on motorways and major A-Roads, according to a report by the RAC Foundation. Report author Harold Dermot outlines several challenges that need addressing.Currently, 80% of EV owners have access to home charging, but 93% use the public charging network.
  • April 27, 2017
    TfL appoints electric vehicle charge point operators
    Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi