Skip to main content

Europe will have over two million public charging points by 2017

A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging. “We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastruc
April 19, 2012 Read time: 2 mins
A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging.

“We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastructure” said Anjan Hemanth Kumar, Frost & Sullivan analyst. ”It will be one of the key factors helping toward the mass deployment of public EV charging infrastructure.”

According to the report, €5 billion investment will be needed over the next seven years. With the expected two million charging stations, Frost & Sullivan foresees for 2017 a ratio of 1.8 cars for each charging station. This scenario is between other even more optimistic (3.2 million charging points by 2017) and other rather pessimistic (1.3 million charging points by 2017) studies already conducted on this particular topic.

According to the report, most of the charging infrastructure (54%) will rely on Level 1 charging, meaning a 10-12A current output in a 230V power input. This mode will mainly be used for charging overnight at home taking 6-8 hours. Semi fast charging (Level 2) will represent 43% of the charging infrastructure, which is also coming from a 230V power input, provides between 16-32A of current output, allowing batteries to charge more than twice as fast as Level 1 charging.

Very-fast charging (Level 3), with different standards and higher safety requirements, will only represent 3% of the charging infrastructure by 2017. Inductive charging will capture around 20-25% of the DC rapid charging share

Related Content

  • McKinsey reveals the $bns spent on mobility
    May 5, 2021
    Investors have poured nearly $330bn into more than 2,000 mobility firms since 2010
  • Vehicles to become the new living space, say researchers
    January 6, 2017
    Improvements in advanced driver assistance system (ADAS) sensors are driving automation features in original equipment manufacturer (OEM) vehicles. By collaborating with leading technology providers in the autonomous driving space, OEMs have an opportunity to transform into mobility service providers and introduce levels 4 and 5 autonomous cars earlier than expected, say Frost & Sullivan researchers. With several suppliers already at work on over-the-air upgrades, the adoption of this feature is expected be
  • VW & BP move fast on EVs
    May 2, 2022
    Industry giants have partnered to build a fast-charging network across Europe by 2024
  • Slow moving US road user charging programme
    July 18, 2012
    Bern Grush recently attended the Mileage-Based User Fee Conference in Austin Texas where the fledgling American landscape for Road User Charging is beginning to take shape. When I was a kid I liked to poke sticks into the ants' nests in sidewalk cracks. Ants would scatter in every conceivable direction. They ran in circles, they ran over and through each other. They screamed without logic. I was fascinated.