Skip to main content

Europe will have over two million public charging points by 2017

A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging. “We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastruc
April 19, 2012 Read time: 2 mins
A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging.

“We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastructure” said Anjan Hemanth Kumar, Frost & Sullivan analyst. ”It will be one of the key factors helping toward the mass deployment of public EV charging infrastructure.”

According to the report, €5 billion investment will be needed over the next seven years. With the expected two million charging stations, Frost & Sullivan foresees for 2017 a ratio of 1.8 cars for each charging station. This scenario is between other even more optimistic (3.2 million charging points by 2017) and other rather pessimistic (1.3 million charging points by 2017) studies already conducted on this particular topic.

According to the report, most of the charging infrastructure (54%) will rely on Level 1 charging, meaning a 10-12A current output in a 230V power input. This mode will mainly be used for charging overnight at home taking 6-8 hours. Semi fast charging (Level 2) will represent 43% of the charging infrastructure, which is also coming from a 230V power input, provides between 16-32A of current output, allowing batteries to charge more than twice as fast as Level 1 charging.

Very-fast charging (Level 3), with different standards and higher safety requirements, will only represent 3% of the charging infrastructure by 2017. Inductive charging will capture around 20-25% of the DC rapid charging share

Related Content

  • GPS accuracy concern in US
    April 17, 2012
    Pressure is growing in the US over concerns that GPS accuracy could be affected. A coalition has formed that comprises an array of the leading construction equipment manufacturers, GPS technology providers and other concerned bodies including those from the agricultural and airline industries. The coalition claims that up to 3.3 million US jobs could be affected by the threat to GPS accuracy, with an economic impact of some US$96 billion in annual direct economic benefits to the US economy.
  • New approach to real time travel information - free of charge
    February 3, 2012
    Austria's national road operator, ASFINAG, has launched the TMCplus traveller information service which is unusual in that it offers encrypted-level services to all users free of charge. Martin Müllner writes
  • Advances in real time traffic and travel information
    March 16, 2012
    David Crawford admires TomTom’s flying start to 2012. Gobal location and navigation equipment supplier TomTom rang in 2012 with two strategically important announcements. First was the signing of a deal with Korean electronics giant Samsung, representing an important consolidation of its position in the consumer market. Under this agreement, TomTom maps and location content will power the Samsung Wave3 smartphone, launched in autumn 2011. TomTom data will support navigation and search-and-find applications
  • Siemens to provide EV charging for Virginia commuter park and ride facility
    May 21, 2012
    Siemens Energy has been commissioned to provide electric vehicle (EV) charging stations to support Loudoun County, Virginia's new commuter park and ride facility in Scott Jenkins Memorial Park. Located 30 minutes outside of Washington, D.C., Loudoun County's initiative with Siemens represents one of the first EV infrastructure deployment projects in the area.