Skip to main content

Europe will have over two million public charging points by 2017

A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging. “We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastruc
April 19, 2012 Read time: 2 mins
A new report from Frost & Sullivan - “Strategic Technology and Market Analysis of Electric Vehicle Charging Infrastructure in Europe” predicts that the electric venicle (EV) charging infrastructure market could grow from less than 10,000 charging stations in 2010 to more than two million in 2017, 3% of which would be based on very-fast charging and inductive charging.

“We are awaiting that European governments will forecast a budget of €700 million over the next seven years to build a charging infrastructure” said Anjan Hemanth Kumar, Frost & Sullivan analyst. ”It will be one of the key factors helping toward the mass deployment of public EV charging infrastructure.”

According to the report, €5 billion investment will be needed over the next seven years. With the expected two million charging stations, Frost & Sullivan foresees for 2017 a ratio of 1.8 cars for each charging station. This scenario is between other even more optimistic (3.2 million charging points by 2017) and other rather pessimistic (1.3 million charging points by 2017) studies already conducted on this particular topic.

According to the report, most of the charging infrastructure (54%) will rely on Level 1 charging, meaning a 10-12A current output in a 230V power input. This mode will mainly be used for charging overnight at home taking 6-8 hours. Semi fast charging (Level 2) will represent 43% of the charging infrastructure, which is also coming from a 230V power input, provides between 16-32A of current output, allowing batteries to charge more than twice as fast as Level 1 charging.

Very-fast charging (Level 3), with different standards and higher safety requirements, will only represent 3% of the charging infrastructure by 2017. Inductive charging will capture around 20-25% of the DC rapid charging share

Related Content

  • CRASH Predicts ‘unpredictable’ in traffic incidents
    November 11, 2015
    Road crashes are not as random as they may appear and analysing data can reveal patterns that can help various authorities target their resources more accurately. David Crawford reports. Figures from the US National Highway Traffic Safety Administration (NHTSA) show that in 2013 there were 32,719 people killed on American roads and 2.31 million injured. While these form part of an overall 25% drop over the decade from 2004, US Transportation Secretary Anthony Foxx continues to stress that reaching the procl
  • Wallbox thinks small with Quasar
    October 13, 2020
    UK's Electric Nation V2G trial is recruiting Nissan EV owners using CrowdCharge app
  • New Zealand entrepreneur to build country’s first fast-charging network
    May 26, 2015
    Founder and managing director of Charge.net.nz, Steve West, aims to build New Zealand’s first electric vehicle (EV) charging network. He claims to have identified 75 sites across the country and plans to have fast chargers installed on all of them by the end of 2017.
  • Smarter transport remains key to smart cities
    January 9, 2018
    Colin Sowman looks at some of the challenges and solutions that will provide enhanced transport efficiency in tomorrow’s smarter cities. However you define a ‘smart city’, one of the key ingredients will be an efficient transport system. As most governments and city authorities face financial constraints, incremental improvements in the existing systems is the most likely way forward. In London, new trains and signalling are improving the capacity of the Underground but that then reveals previously