Skip to main content

Europe and Brazil implement open-access railway concession model

Brazil's ground transport agency ANTT and the European Railway Agency (ERA) have signed a memorandum of understanding and are working together to implement ANTT’s open-access railway concession model. The agreement calls for cooperation between regulators and for issues relating to technical requirements and standards to be addressed. Previously, Brazil's railway concessions included both the building and operating of railroads in one contract. Open-access, however, separates the transportation of car
September 30, 2014 Read time: 2 mins
Brazil's ground transport agency ANTT and the European Railway Agency (ERA) have signed a memorandum of understanding and are working together to implement ANTT’s open-access railway concession model.

The agreement calls for cooperation between regulators and for issues relating to technical requirements and standards to be addressed.

Previously, Brazil's railway concessions included both the building and operating of railroads in one contract. Open-access, however, separates the transportation of cargo from the building and operating of lines. The new model is expected to open up more cargo handling opportunities, increase logistics efficiency, reduce freight costs, and improve Brazil's competitiveness.

While open-access is already widely adopted in Europe, ANTT launched its model in June, calling for independent railway operators to express their interest in freight transport along a stretch of the Norte-Sul railway built by federal rail company Valec.

The open access model, which is part of Brazil's overall strategy to improve its rail network, falls under the national logistics improvement plan, under which some US$40.9 billion has been earmarked to build and improve approximately 11,000 kilometres of railways.

Related Content

  • Rail industry, regulators debate feasibility of PTC
    March 10, 2014
    US rail industry officials and federal accident regulators have disagreed about the viability of a looming mandate that most US railways be equipped with automated control systems by the end of next year. Congress is requiring that most major railroad companies install automated systems known as positive train control (PTC) by December 2015. Automated train systems have gained renewed attention after a spate of high-profile accidents on passenger and freight railways, including most recently a Decem
  • Building Europe’s roads for driverless age
    June 17, 2022
    Creating smart, co-operative road transport systems that harness the white heat of technology won’t be easy but a new document shows the way – Andrew Stone does some reading…
  • The inside story of how traffic chaos was avoided after I-95 collapse
    August 23, 2023
    June’s collapse of major US roadway I-95 in Pennsylvania could have caused lengthy traffic chaos. But - relatively speaking at least - it didn’t and gridlock was avoided. Alan Dron finds out why
  • Outsourcing security weakness for Sweden’s driver and vehicle data
    October 24, 2017
    The security of driver and vehicle data hit the headlines this summer in Sweden and its authorities are still dealing with the fallout. David Crawford reports. epercussions from Sweden’s vehicle data outsourcing scandal continue to reverberate. Transportstyrelsen, the government’s transport agency, came under fire this summer for risking the personal security of over five million motorists by failing to implement full security checks on personnel in other countries to whom individual work packages could