Skip to main content

Europe and Brazil implement open-access railway concession model

Brazil's ground transport agency ANTT and the European Railway Agency (ERA) have signed a memorandum of understanding and are working together to implement ANTT’s open-access railway concession model. The agreement calls for cooperation between regulators and for issues relating to technical requirements and standards to be addressed. Previously, Brazil's railway concessions included both the building and operating of railroads in one contract. Open-access, however, separates the transportation of car
September 30, 2014 Read time: 2 mins
Brazil's ground transport agency ANTT and the European Railway Agency (ERA) have signed a memorandum of understanding and are working together to implement ANTT’s open-access railway concession model.

The agreement calls for cooperation between regulators and for issues relating to technical requirements and standards to be addressed.

Previously, Brazil's railway concessions included both the building and operating of railroads in one contract. Open-access, however, separates the transportation of cargo from the building and operating of lines. The new model is expected to open up more cargo handling opportunities, increase logistics efficiency, reduce freight costs, and improve Brazil's competitiveness.

While open-access is already widely adopted in Europe, ANTT launched its model in June, calling for independent railway operators to express their interest in freight transport along a stretch of the Norte-Sul railway built by federal rail company Valec.

The open access model, which is part of Brazil's overall strategy to improve its rail network, falls under the national logistics improvement plan, under which some US$40.9 billion has been earmarked to build and improve approximately 11,000 kilometres of railways.

Related Content

  • September 12, 2014
    Brazil approves US$4.7 billion railway project
    Brazil's transport ministry has approved a plan from mining and transport company Vale to carry out US$4.68 billion in railway infrastructure works. The project falls under the country's northern region logistics program and will facilitate transport of production from Vale's (US$17.6 billion Carajás Serra Sul iron ore project (S11D) which begins in 2015. Civil works will take place along Pará state's Sudeste railway network, connecting S11D to the Carajás railroad, which links to the Ponta da Madeira
  • July 31, 2012
    Russia's high speed toll link - aims and opportunities
    Construction of a new toll link between the Russian capital of Moscow and the country's second-largest city, the port of St Petersburg, is due to start in 2012. Here, ITS International takes look at the project to date and the opportunities for foreign companies to get involved. The construction of a new toll link between the Russian capital Moscow and the country's second-largest city St Petersburg has a number of aims. It will lead to the creation of a high-speed vehicular link between the two which will
  • December 19, 2014
    Brazil completes US$25bn PAC transport works
    The Brazilian government completed about US$24.5 billion worth of transportation infrastructure projects under the second phase (2011-14) of its growth acceleration plan (PAC). According to the latest PAC report, a total of 5,188kilometres of roadwork has been completed over the last four years, including 1,413 kilometres through concession contracts. Works included widening highway BR-060 in Goiás state; and building the Rio de Janeiro Arco beltway along highway BR-493, highway BR-448 (Rodovia do Par
  • February 6, 2020
    Truck platooning: the evidence is complex
    A number of claims are made for the value of truck platooning. David Crawford looks at the figures from a new set of examples which suggest that the situation is more complex than you might think