Skip to main content

EU-wide Railway at low level status of deployment

Deployment of the European Rail Traffic Management System (ERTMS), an EU-wide railway signalling system is proceeding at a very low-level, according to a new report from European Court of Auditors. In assessing if the ERTMS had been proper planned, deployed and managed, the auditors visited Denmark, Germany, Spain, Italy, Poland and the Netherlands and detected a reluctance from infrastructure managers to invest in the necessary equipment due the expense and a lack individual business cases.
October 6, 2017 Read time: 2 mins
Deployment of the European Rail Traffic Management System (ERTMS), an EU-wide railway signalling system is proceeding at a very low-level, according to a new report from European Court of Auditors.

In assessing if the ERTMS had been proper planned, deployed and managed, the auditors visited Denmark, Germany, Spain, Italy, Poland and the Netherlands and detected a reluctance from infrastructure managers to invest in the necessary equipment due the expense and a lack individual business cases.   

There is also no overall cost estimate to establish necessary funding and its sources, while the legal obligations introduced did not cover decommissioning of national rail systems. The report also revealed a lack of alignment with deadlines and priorities included within the EU transport policy.

The auditors make a series of recommendations for the EC, the Member States and the European Union Agency for Railways concerning the assessment of deployment costs; decommissioning of national signalling systems and individual business cases for infrastructure managers and railway undertakings. In addition it identifies the compatibility and stability of the system; the role and resources of the European Union Agency for Railways; alignment of national deployment plans, monitoring and enforcement; improved take-up of EU funds for rail signalling projects; and better targeting of EU funding.

Related Content

  • January 10, 2012
    Robust enforcement strategy needed for free flow toll roads
    Timidity has no place in effective enforcement operations on free-flow toll roads, says the NRA's Cathal Masteron. What's needed is a robust strategy which starts big and reduces in size over time, rather than starts small and gains a reputation for being easy to avoid
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • March 16, 2015
    Report analyses multiple ITS projects to highlight cost and benefits
    Every year in America cost benefit analysis is carried out on dozens of ITS installations and pilot studies and the findings, along with the lessons learned, are entered into the Department of Transportation’s (USDOT’s) web-based ITS Knowledge Resources database. This database holds more than 1,600 reports and periodically the USDOT reviews the material on file to draw conclusions from this wider body of evidence. It has just published one such review ITS Benefits, Costs, and Lessons Learned: 2014 Update Re
  • May 18, 2016
    EU aims to turn ITS theory into practice
    Gareth Horton explains how the European Commission’s Transport Research and Innovation Portal can help expedite research and turn theory into practice. Over the next few years Europe’s transport systems face a number of challenges, such as improving urban mobility while at the same time protecting population health and accommodating the accessibility needs of an ageing but active population.