Skip to main content

Electric avenue for Western Isles

Electric vehicle (EV) charge point supplier Evolt has worked with Comhairle nan Eilean Siar (Western Isles Council) in creating a north-south EV charging network throughout the islands of the Outer Hebrides, Scotland. A total of 11 charge points have been strategically positioned on the Isles of Lewis and Harris, North Uist, South Uist and Barra, which make up the majority of the Council’s remit. The new network adds to the existing Evolt charge points procured and installed at the ferry ports throughout
October 12, 2016 Read time: 2 mins
Electric vehicle (EV) charge point supplier Evolt has worked with Comhairle nan Eilean Siar (Western Isles Council) in creating a north-south EV charging network throughout the islands of the Outer Hebrides, Scotland.

A total of 11 charge points have been strategically positioned on the Isles of Lewis and Harris, North Uist, South Uist and Barra, which make up the majority of the Council’s remit. The new network adds to the existing Evolt charge points procured and installed at the ferry ports throughout the Western Isles.

The news also follows Evolt’s selection as one of the Energy Saving Trust’s EV charge point suppliers on a Scotland-wide framework agreement.

Three Rapid chargers that can efficiently charge two EVs to 80% of their battery life within 30 minutes through a 50Kw AC and 43Kw DC outlet have been installed at key locations throughout the region. These are supplemented by three 22kW Fast chargers for quick ‘top ups’; these have AC and DC capability and take one hour to simultaneously charge two EVs. Five 7kW Street chargers complete the Islands’ north-south network.

Related Content

  • Consultation to examine how UK electricity network can prepare for increase in EVs
    October 13, 2016
    The UK’s Smart EV project is launching its Consultation on Managed EV Charging at the Low Carbon Networks Innovation Conference in Manchester. The Consultation invites stakeholder views to ultimately secure a standardised industry-wide agreement for the connection, charging and control of electric vehicles. The project’s ultimate aim is to achieve agreement across a number of industries on the best way to help facilitate the roll out of controlled EV charging. In doing so, it will enable significantly
  • Isle of Wight invests in Flowbird’s solar-power parking
    July 10, 2019
    Island Roads has replaced around 40 parking terminals with solar-powered systems from Flowbird Urban Intelligence at a variety of locations across the Isle of Wight, off the south coast of the UK. Island Roads is responsible for the island’s highways network and associated services and selected the Flowbird Strada Rapide terminals in a bidding process. Flowbird says the machines are linked to its Smartfolio, allowing Island Roads to remotely monitor its estate while also providing parking and paymen
  • The future of ITS post recession
    January 25, 2012
    ACS, A Xerox Company's Cees de Wijs talks about post-recession recovery and what we might expect to see in the coming years
  • TransCore wins three ITS contracts from Nevada DOT
    April 25, 2012
    TransCore has won three separate contracts to provide ITS design, construction and integration services for the Nevada Department of Transportation. The projects include a 30-mile extension of the FAST traffic management system along I-15 from outside Las Vegas to the California border; a 15-mile expansion of the FAST traffic management system along I-515 on the eastern side of the Las Vegas metropolitan area; and a 10-mile segment of I-80 in Reno, Nevada, as part of a roadway reconstruction project.