Skip to main content

EIB increases support for high-speed trains

The European Investment Bank (EIB) is increasing its loan for Poland’s PKP Intercity’s Pendolino trains from US$288 million to US$440 million. The project consists of the purchase of twenty modern high-speed trains and the construction of an associated maintenance depot in Warsaw. With the increase of financing, the bank aims to ensure smooth project implementation by completing the financing plan. The high-speed passenger connections will be available between Gdynia, Warsaw and Krakow/Katowice, part of a T
May 16, 2013 Read time: 2 mins
The 4270 European Investment Bank (EIB) is increasing its loan for Poland’s PKP Intercity’s Pendolino trains from US$288 million to US$440 million. The project consists of the purchase of twenty modern high-speed trains and the construction of an associated maintenance depot in Warsaw. With the increase of financing, the bank aims to ensure smooth project implementation by completing the financing plan.

The high-speed passenger connections will be available between Gdynia, Warsaw and Krakow/Katowice, part of a Trans-European Transport Networks project connecting Gdansk, Warsaw, Brno/Bratislava and Vienna. Further high-speed train services are now also expected to be provided to Gliwice via Katowice, to Wroclaw via Opole and to Rzeszow via Tarnow. Services with the new trains may start in December 2014.

With the EIB strongly encouraging a shift from cars towards rail transport, the new trains will provide time savings and assure high levels of passenger safety and comfort. The related depot has been built on an existing railway site close to Warszawa Grochow and will cater for the maintenance and servicing of new trains.

The modern technology trains co-financed by the EIB will replace obsolete equipment and comply with applicable European standards for passenger safety, noise emissions and access for persons with reduced mobility.

Related Content

  • July 16, 2012
    A fresh approach to electronic fee collection
    The Utah Transit Authority (UTA) is pioneering fresh approaches to Electronic Fee Collection (EFC) deployment in the US. Its new system, operational since January 2009 on all buses and commuter trains, is the country's first full-network rollout of transit e-ticketing technology built on an open-payment network, according to the organisation's Technology Programme Development Manager Craig Roberts.
  • October 23, 2012
    Ho Chi Minh City plans rapid bus system
    As part of an initiative to develop a modern transport system for Ho Chi Minh City, the municipal administration plans to spend around US$152 million on a bus rapid transit (BRT) project that will run along the 25km Vo Van Kiet – Mai Chi Tho boulevard, connecting the eastern and western parts of the city. The BRT system is expected to have 30 modern buses and, according to the municipal transport department, is a feasible solution for traffic congestion problems. A green corridor that will use solar energy
  • December 16, 2014
    Do satellites provide a heavenly view of tolling’s future?
    Satellite-based tolling opens up new options for authorities and can be integrated with DSRC systems as David Crawford discovers. As the proud custodian of the European Union (EU)’s longest road network covered by a single (truck) charging scheme – and the only one to include all major roads - Slovakia has become the continent’s poster-nation for the virtues of GNSS/CN (Global Navigation Satellite System/Cellular Network)-based tolling. It is also proved to be a very fast implementer. Speaking at the 2014 I
  • April 5, 2016
    FRA makes funding available for positive train control implementation
    The US Department of Transportation’s Federal Railroad Administration (FRA) is accepting applications for US$25 million in competitive grant funding available to railroads, suppliers, and state and local governments for positive train control (PTC) implementation. The funding is part of the 2016 Consolidated Appropriations Act that funds the US Department of Transportation. Applications will be accepted until 19 May 2016 and FRA will give preference to projects that would provide the greatest level of p