Skip to main content

Egis in talks for Bordeaux lane-changing system

France-based international engineering and project installation group Egis is in discussions with Bordeaux’s city authorities to create a dynamic lane-changing system in the city.
October 8, 2015 Read time: 2 mins

France-based international engineering and project installation group 7319 Egis is in discussions with Bordeaux’s city authorities to create a dynamic lane-changing system in the city.

Bordeaux wants to improve a 700-metre brownfield quayside site from its current status as informal open space to a public park.

The area is currently bounded by a four-lane road consisting of two bus lanes and two lanes for other vehicles. To expand the parkland area, the city wants to reduce the roadway to three lanes, with priority being given to traffic heading into the city in the morning rush hour, then switching to give priority to outbound traffic in the late afternoon and evening.

Two lanes will be designated for traffic travelling towards the city in the morning, with two lanes heading out of the city in the afternoon.
To guide drivers, the roadway will be marked with red lights set into its surface, indicating the changing position of the dividing line between the different directions.

To ease the transition in direction, the central lane will be blocked off to traffic from both directions from mid-morning to mid-afternoon, said Michel Sejalon, Egis’s business development manager, mobility and systems.

“This type of solution already exists on motorways and in inter-urban areas, but it’s a new approach for urban areas,” he said, “We are discussing the concept with the Bordeaux city authorities.”

Related Content

  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • March 23, 2015
    I-80 Smart Corridor sets the ITS standard for California's Bay Area
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • April 25, 2013
    Diverse development of tolling business models
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma
  • April 2, 2021
    Transit takes on demanding role
    Community transport - or paratransit - has historically formed the basis of demand-responsive operations. But with new routing technologies, David Crawford sees wider potential