Skip to main content

Egis, Systra to carry out design studies for Medina metro

The Medina Metro Development Authority (MMDA) has awarded Egis, in association with Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead. The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country,
March 16, 2015 Read time: 2 mins
RSSThe Medina Metro Development Authority (MMDA) has awarded Egis, in association with 5602 Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead.

The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country, Medina has to deal with an influx of several million pilgrims each year.

The consortium will carry out feasibility studies and the preliminary design for the metro, including the preparation of invitation to tender documentation for design and build contracts. Over a 12-month period, the project team based in Medina will draw on all of 7319 Egis’ expertise required for this huge project: civil engineering, architecture, environment, rolling stock, signalling, telecoms, operating strategy, etc.

The project is divided into two phases, with the metro is due to enter into service in 2020.

This new contract comes as a complementary addition to the metro services provided currently by Egis in the Middle East in the fields of project management and works supervision contracts.

For more information on companies in this article

Related Content

  • Tenerife opts for contactless ticketing
    March 24, 2015
    Indra has been awarded a US9.9 million contract by Tenerife's regional government to implement the latest public transportation management technology in its urban and inter-city services. Indra will install an operation assistance system (OAS) to manage a fleet of 530 buses on the island and an integrated contactless-ticketing solution for its buses and streetcar services. Indra's new multimode contactless-ticketing system means that the ticket has only to be passed over a reader, replacing the current magn
  • Kuwait opts for Jenoptik enforcement
    January 24, 2014
    Jenoptik’s Traffic Solutions division and its long-term local partner, First Joint Group, are to supply the Kuwait Ministry of Interior with fixed and mobile radar-based speed and red light enforcement systems to upgrade all traffic enforcement equipment in the country. The systems are equipped with the latest digital camera and tracking radar technology Delivery of the order, valued at more than US$2.7 million, is scheduled to begin in the first quarter of 2014. Jenoptik traffic safety technology ha
  • Alstom consortium wins Spanish rail signalling contract
    April 25, 2014
    An Alstom-led consortium which includes Bombardier and Indra has been awarded a contract worth US$567.5 million by the Spanish infrastructure manager ADIF to supply its European Train Control System (ERTMS) Level 2 signalling system, together with maintenance for a period of 20 years for Spain’s new north-west high speed line.
  • Kapsch equips high speed line in Spain with latest train communication technology
    April 2, 2012
    Kapsch CarrierCom has successfully implemented the latest train security and communication technology on the first high speed line in the Galicia region in the North West of Spain. The route between Orense and Santiago covers 87 km of tracks with 29 km of tunnels through a very mountainous area. Kapsch has been the Base Station Subsystem (BSS) GSM-R system turnkey supplier including network design, network integration and optimisation to the project. The company has also supplied all site infrastructure req