Skip to main content

Egis to operate and maintain Sydney’s WestConnex

Sydney Motorway Corporation (SMC), Australia, has awarded the contract for the operation and maintenance of WestConnex, Australia’s largest road infrastructure project, to Fulton Hogan Egis O&M (FHEO&M, a partnership of Egis Projects Asia Pacific and Fulton Hogan Construction. WestConnex, which is intended to significantly reduce travel times for commuters in the Sydney area is being delivered in three stages: Stage 1 (WestConnex M4) includes the widening of existing M4 motorway as well as a 5.5km tunne
January 12, 2016 Read time: 2 mins
Sydney Motorway Corporation (SMC), Australia, has awarded the contract for the operation and maintenance of WestConnex, Australia’s largest road infrastructure project, to Fulton Hogan Egis O&M (FHEO&M, a partnership of 533 Egis Projects Asia Pacific and Fulton Hogan Construction.
 
WestConnex, which is intended to significantly reduce travel times for commuters in the Sydney area is being delivered in three stages: Stage 1 (WestConnex M4) includes the widening of existing M4 motorway as well as a 5.5km tunnel extension; Stage 2 (WestConnex M5) includes a new 9km  road tunnel which will more than double capacity of the existing M5 East motorway corridor and provide a new  interchange, north of the city’s airport; Stage 3 (WestConnex M4-M5 Link) will link stages 1 and 2 via a new road tunnel, connecting the M4 and M5 corridors.
 
The contract term for stages 1 and 2 is 10 years. Operation and maintenance will start in 2019.
 
The contract also includes the operation and maintenance of the existing M5 East Motorway, previously operated and maintained by Egis as part of the BHEgis joint venture from 2001 to 2011. 

For more information on companies in this article

Related Content

  • Siemens to maintain All Aboard Florida trains
    July 1, 2015
    All Aboard Florida has selected Siemens as the full maintenance provider for its passenger-rail trains connecting Orlando and Miami, starting in 2017. Under a 30-year contract agreement, Siemens will maintain and service all aspects of All Aboard Florida’s passenger-rail vehicles, including inspections, corrective and preventative maintenance, and provisioning of parts and labour. As previously announced, Siemens is also building trains for the project, which, will be constructed at its solar-powered ra
  • Receiving real time passenger information in Finland
    February 3, 2012
    David Crawford sees lively prospects for Finnish innovation
  • Mott MacDonald designed M2M metering scheme begins testing
    December 20, 2017
    Mott MacDonald (MM) has designed a Highways England scheme to smooth traffic flows, reduce queues and to combat eastbound congestion on the M62's junction 10 and 11 as well as traffic joining the motorway from the M6 northbound and southbound link roads. The project will operate during 2018 and be monitored to evaluate the benefits. Called The Motorway to Motorway (M2M) metering pilot scheme, it combines variable mandatory speed limits on the M62 and metering using traffic signals between the M6 to M62
  • China joins the world's most exclusive ITS technology club
    January 31, 2012
    China has joined the only two countries in the world – Germany and Japan - to have developed maglev (magnetic levitation) high-speed rail technology.