Skip to main content

Egis to deliver incident response and maintenance for Queensland’s tunnel network

Egis subsidiary Tunnel Network Services (TNS) has been selected by Transurban Queensland, Australia, operator of the go via network, to deliver incident response and routine maintenance services for its tunnel network in Brisbane.
June 9, 2017 Read time: 1 min

7319 Egis subsidiary Tunnel Network Services (TNS) has been selected by 600 Transurban Queensland, Australia, operator of the go via network, to deliver incident response and routine maintenance services for its tunnel network in Brisbane.

Egis will provide these service to a network with a total length of around 24 km, including 15.5 km of tunnels. The network comprises Legacy Way, Go Between Bridge, AirportlinkM7, Inner City Bypass and Clem7. The services will commence progressively between 2017 and 2019.

TNS will deliver integrated services in line with Transurban Queensland’s network approach to operations and maintenance. Network-wide operations and maintenance will drive enhanced outcomes, achieve synergies and deliver high quality services to the tunnel network users through faster response times and a clear focus on safe lane availability.

Related Content

  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • April 11, 2017
    JV wins multi-billion dollar West Gate Tunnel project
    CPB Contractors has been selected by Australian toll road operator Transurban as the preferred contractor to deliver Victoria’s multi-billion dollar West Gate Tunnel Project in a joint venture with John Holland. The West Gate Tunnel Project will address a number of critical challenges in relation to traffic, growth and liveability across Melbourne. Design and construction works include widening the West Gate Freeway from eight lanes to 12 between the M80 Ring Road and Williamstown Road, as well as bui
  • May 11, 2017
    Lindsay zips-up lane closure solution
    Moveable barrier systems are offering engineers a new traffic management options. Work zones - be they for maintenance or road widening - are a fact of life and when they occur on major highways, they create no end of problems for traffic planners and travellers alike.
  • November 30, 2015
    Indra wins in India with two transport and traffic contracts
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with