Skip to main content

EBRD investment to modernise Serbia's railways

The European Bank for Reconstruction and Development (EBRD) is continuing to support the modernisation of Serbia’s transport infrastructure and promote further reform of the rail sector with a sovereign-guaranteed loan of up to €95 million (US$125 million) to the Serbian Railways company.
March 15, 2012 Read time: 2 mins
The 2001 European Bank for Reconstruction and Development (EBRD)  is continuing to support the modernisation of Serbia’s transport infrastructure and promote further reform of the rail sector with a sovereign-guaranteed loan of up to €95 million (US$125 million) to the 3911 Serbian Railways company.

The investment will finance the rehabilitation of key sections of Corridor X, the main north-south route running through Serbia, which is also the country’s key regional link with its neighbours.

As the most important component of the railway network in Serbia, Corridor X handles over 50 per cent of all rail traffic. However, much of it is in a poor state, resulting in speed restrictions, or is in need of modernisation to meet anticipated traffic flows. More than 50 per cent of the network operates at speeds of less than 60 km/hour.

The EBRD loan will help Serbian Railways to address these limitations by financing the modernisation of a 14km section of Corridor X from Belgrade Central Station through Rakovica to Resnik, as well as the renewal of approximately 50km of track along key sections of this Corridor. The project will enhance the speed and reliability of passenger and freight rail services in Serbia.

The EBRD is supporting the ongoing reform of Serbian Railways, particularly the creation of separate passenger, freight and infrastructure companies, and the opening of the rail freight market to private operators. The objective of these reforms is to increase efficiency, and the quality of rail services offered to the market.

For more information on companies in this article

Related Content

  • E-tolling is the new normal
    April 29, 2020
    Electronic tolling has become a cornerstone for the next wave of innovation, says IBTTA’s Bill Cramer. So is this the end of the road for toll plazas?
  • Traffic flow information substantiates benefits of new route
    August 20, 2012
    The number of heavy goods vehicles (HGVs) travelling through Carlisle’s city centre in the north east of England is estimated to have been reduced by more than a third since the US$276.5 million Carlisle Northern Development Route opened in February 2012. Information gathered from a network of 20 permanent and temporary traffic counters dotted around the city showing ‘before and after’ CNDR road usage is starting to build a more meaningful picture of the benefits the new road has brought to Carlisle.
  • Need for simpler urban tolling solutions
    January 10, 2013
    A common assumption, even amongst informed observers, is that there’s but a handful of urban charging schemes in operation around the world and scant prospect of that changing any time soon. Larger city-sized schemes such as Singapore, London and Stockholm come readily to mind but if we take a wider view and also consider urban access control and Low Emission Zones (LEZs) then the picture changes rather radically. There is a notable concentration of such schemes in Europe but worldwide the number is comfort
  • Slow development of Europe's road user charging
    April 24, 2013
    Delegates convened in Brussels for Europe’s 10th annual Road User Charging Conference in March, when both positive and negative developments came to light for advocates of more widespread introduction of RUC. Jon Masters reports. Goings on across Europe in recent months have again demonstrated how very sensitive road user charging (RUC) is politically. At the 10th annual Road User Charging Conference in Brussels at the beginning of March, a Danish delegation was notable for its absence, but Belgian governme