Skip to main content

EBRD investment to modernise Serbia's railways

The European Bank for Reconstruction and Development (EBRD) is continuing to support the modernisation of Serbia’s transport infrastructure and promote further reform of the rail sector with a sovereign-guaranteed loan of up to €95 million (US$125 million) to the Serbian Railways company.
March 15, 2012 Read time: 2 mins
The 2001 European Bank for Reconstruction and Development (EBRD)  is continuing to support the modernisation of Serbia’s transport infrastructure and promote further reform of the rail sector with a sovereign-guaranteed loan of up to €95 million (US$125 million) to the 3911 Serbian Railways company.

The investment will finance the rehabilitation of key sections of Corridor X, the main north-south route running through Serbia, which is also the country’s key regional link with its neighbours.

As the most important component of the railway network in Serbia, Corridor X handles over 50 per cent of all rail traffic. However, much of it is in a poor state, resulting in speed restrictions, or is in need of modernisation to meet anticipated traffic flows. More than 50 per cent of the network operates at speeds of less than 60 km/hour.

The EBRD loan will help Serbian Railways to address these limitations by financing the modernisation of a 14km section of Corridor X from Belgrade Central Station through Rakovica to Resnik, as well as the renewal of approximately 50km of track along key sections of this Corridor. The project will enhance the speed and reliability of passenger and freight rail services in Serbia.

The EBRD is supporting the ongoing reform of Serbian Railways, particularly the creation of separate passenger, freight and infrastructure companies, and the opening of the rail freight market to private operators. The objective of these reforms is to increase efficiency, and the quality of rail services offered to the market.

For more information on companies in this article

Related Content

  • Diverse development of tolling business models
    April 25, 2013
    A diversity of tolling business models offers a wider toolbox of highway finance options, as the IBTTA’s Patrick Jones explains. The business models for America’s tolled highways have gone through several different evolutions over the last 75 years, reflecting a succession of shifts in transportation policy and politics, financing and funding models, urban patterns, customer needs, and technology. And with more and more decision-makers expressing renewed interest in tolling, it’s that very diversity that ma
  • Keeping a weather eye on road conditions
    September 26, 2014
    Drive C2X has shown that advanced warning of poor road conditions could cut fatalities, as David Crawford explains. Connected vehicle (CV)-based warning technologies could mean 6% fewer deaths and 5% fewer injuries in road traffic accidents in Europe, according to the final results of the European Commission (EC) co-funded DRIVE C2X project. According to the European Centre for Information and Communication Technologies (EICT) which provided management support, these “prove that CV systems work and can hav
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.
  • ‘Formation flying’ engineering trains used to upgrade railway
    February 16, 2017
    In a bid to increase efficiencies and reduce delays for passengers, the UK’s Network Rail is trialling ‘formation flying’ engineering trains to repair and renew the 20,000 miles of railway track it is responsible for maintaining. It says this new approach to engineering could potentially save taxpayer-funded Network Rail US$313,000 (£250,000) per week in costs by allowing trains to run at higher speeds once engineering is complete. The pioneering technique was used successfully at Sandy, Bedfordshire, on