Skip to main content

Driverless trains begin operation on Milan Metro line 5

Driverless vehicles have begun operation on the Milan Metro line 5 extension which opened on the 29 April. Ansaldo STS delivered 19 trains to Milan Metro operator ATM, which will run on the extended 12.8 kilometre line to San Siro Stadio and will stop at five newly opened stations. A further five stations will be opened in October this year. The system allows remote supervision of daily train traffic and is able to change the frequency of trains to meet the fluctuating demands of daily traffic, ad
May 7, 2015 Read time: 1 min
Driverless vehicles have begun operation on the Milan Metro line 5 extension which opened on the 29 April.    

Ansaldo STS delivered 19 trains to Milan Metro operator ATM, which will run on the extended 12.8 kilometre line to San Siro Stadio and will stop at five newly opened stations. A further five stations will be opened in October this year.

The system allows remote supervision of daily train traffic and is able to change the frequency of trains to meet the fluctuating demands of daily traffic, adding more trains during rush hours and reducing them during quieter periods.

Related Content

  • October 7, 2024
    KeolisAmey reappointed to operate London's automated rail system
    New eight-year €140m deal from Transport for London to run Docklands Light Railway
  • February 12, 2016
    Consortium awarded LRT project in Canada
    TransEd Partners, a consortium including global engineering and construction company Bechtel, has been selected by the City of Edmonton to finance, design, supply vehicles, build, operate, and maintain the first phase of the Edmonton Valley Line Light Rail Transit project. The Valley Line is central to the City of Edmonton's transportation plan, designed to meet the demands of Canada's second fastest-growing city that is expected to increase in size by 50 per cent by 2040.
  • January 30, 2018
    TST awarded signalling contract for shanghai automated metro line
    Shanghai Shentong Metro Group has awarded Thales SEC Transport the signalling contract for the Fully Automated Operation (FAO) Line 14 of the City’s Metro. It will provide an integrated management system as well as signalling and supervision solutions with the intention of meeting the demand for metro transport capacity and alleviating traffic in the downtown area. The driverless and highly automated line is scheduled to enter service at the end of 2020.
  • August 5, 2016
    Kapsch CarrierCom implements radio network for Rio De Janeiro metro line
    Kapsch CarrierCom has provided the TETRA (Terrestrial Trunked Radio) communications infrastructure for Line 4 in Rio de Janeiro, Brazil, which began operating on 1 August, in time for the 2016 Olympic Games. TETRA offers voice and data connectivity that is dedicated, secure and highly reliable, ensuring optimal network performance. It facilitates communication for the operator, transmits relevant operational data, and makes a key contribution to an increasing passenger safety and efficiency. The compa