Skip to main content

Doha Metro contract awarded

A consortium led by Spain’s FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro. The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel. The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said. The metro is due for completion in 2019.
March 12, 2014 Read time: 1 min
A consortium led by Spain’s 5656 FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro.

The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel.

The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said.  The metro is due for completion in 2019.

Related Content

  • January 9, 2014
    Salvador metro engineering contract awarded to Egis
    French engineering and construction firm Egis has been awarded a US$16 million engineering contract by Brazil’s build and operate concessionaire CCR (Companhia de Concessões Rodoviárias) for the construction of the Salvador metro in the state capital of Bahia, Brazil. The project comprises the completion of the seven kilometre line 1, which is partly underground, the construction of five kilometres of extensions to this first line and the construction of the 24 kilometre line 2, serving Salvador’s inter
  • October 24, 2014
    Strabag consortium awarded Eisack River undercrossing contract
    Construction group Strabag, in a consortium with the Italian construction companies Salini Impregilo, Consorzio Cooperative Costruzioni and Collini Lavori, has been awarded a US$379.5 million contract to build the Eisack Undercrossing section of the Brenner Base Tunnel. Work is scheduled to begin this year with a planned construction time of around eight years. The contract section is located at the southern end of the Brenner Base Tunnel near the town of Franzensfeste (Fortezza) in the Province of Bozen
  • August 17, 2015
    Thales Siemens JV wins Spanish high speed rail contract
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar
  • April 12, 2018
    Louis Berger awarded Mumbai Metro Line four contract
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central