Skip to main content

Doha Metro contract awarded

A consortium led by Spain’s FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro. The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel. The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said. The metro is due for completion in 2019.
March 12, 2014 Read time: 1 min
A consortium led by Spain’s 5656 FCC and comprising Archirodon (Greece), Yüksel (Turkey) and Petroserv (Qatar) has announced that it has been awarded a US$700 million contract to build the Red Line, a section of Doha Metro.

The contract includes building three elevated stations and a 6.97 kilometre section and the construction of a tunnel.

The execution period is 31 months and the project will create more than 1,000 jobs, the consortium said.  The metro is due for completion in 2019.

For more information on companies in this article

Related Content

  • Companies depend on automation, AI and machine learning for cyber security
    February 23, 2018
    To defend against cyber attacks, 39% of organisations are reliant on automation, 34% on machine learning and 32% on artificial intelligence (AI), according to the Cisco 2018 annual report conducted on 3,600 chief information security officers. It found that over half of all attacks resulted in financial damages of more than $500,000 (£697,000), including, but not limited to, lost revenue, clients, opportunities, and out-of-pocket costs. The study revealed that adversaries are using Malware sophistication
  • Iteris’ plan of compliance letter accepted by NYSE
    August 15, 2014
    The New York Stock Exchange has accepted Iteris’ plan of compliance and granted an extension until 15 October 2014 to regain compliance. Iteris previously announced that it had received a letter from the Exchange indicating that the Exchange has determined that the company was not in compliance with Sections 134 and 1101 of the Exchange’s Company Guide due to the company’s inability to file its Annual Report on Form 10-K for the year ended 31 March 2014 with the SEC by the requisite deadline. The company
  • MoneySuperMarket: 49% of British public surveyed have never considered buying EV or Hybrid Car
    November 7, 2017
    49% of the of the British public have stated that they have never considered buying an electric car (EC) or hybrid car, according to recent research by MoneySupermarket.com. These findings come from a survey carried out by the comparison site on 1,000 UK car owners to determine whether the British public is prepared for the electric switch following the government’s plans to prohibit petrol and diesel vehicles by 2040. It examined the cost, the number of charging points and public opinion.
  • Indra to equip Buenos Aires train network with access control and ticketing
    February 16, 2016
    Spanish multinational Indra is to deploy its access control and ticketing technology across the Buenos Aires Metropolitan Area (BAMA) rail network, one of the world's largest with more than 200 stations. The contract also includes system maintenance during a two-year period. Argentina's national rail operator has awarded Indra the contract, worth US$39 million, under which the firm will equip eight lines with 1,400 access control machines, or turnstiles; 170 disabled entrances; 200 automatic recharging m