Skip to main content

Denmark expands EV charging infrastructure

Denmark’s electric vehicle (EV) charging infrastructure is to be expanded with the installation of fifty smart DC fast chargers. Electric mobility operator Clever has chosen power and automation technology group ABB to supply and maintain the fast chargers throughout Denmark. The companies say the ABB Terra 51 chargers, which are to be installed at strategic locations in the country, are ideally suited for freeway driving and has the capacity to fast charge electric vehicles in a matter of thirty minutes.
November 22, 2012 Read time: 2 mins
Denmark’s electric vehicle (EV) charging infrastructure is to be expanded with the installation of fifty smart DC fast chargers. Electric mobility operator Clever has chosen power and automation technology group ABB to supply and maintain the fast chargers throughout Denmark.

The companies say the ABB Terra 51 chargers, which are to be installed at  strategic locations in the country, are ideally suited for freeway driving and has the capacity to fast charge electric vehicles in a matter of thirty minutes.

ABB web-connected fast chargers have the capacity to offer full range connectivity, remote assistance and software upgrading and are capable of being connected to electric distribution system or smart grid for effective and timely charging of electric vehicles.

The chargers have been specially chosen due to their reliability and higher level of uptime. The company is well versed in the demands for quick and efficient fast charging in the EV industry.

"We are delighted that we have signed an agreement with ABB. At Clever, the development of a smart EV charging network that is able to easily implement ABB's fast charging products, along with other suppliers, enables us to shortlist the right products at the right price; benefiting our customers," says Lars Bording, Clever's CEO.
Clever's network of DC fast chargers and AC chargers builds on Denmark's commitment to becoming independent of fossil fuels by 2050. The country will reach its ambitious goal by increasing energy efficiency and resource optimisation; by expanding the share of renewable energy from sources such as wind and biomass; and by driving the development of an intelligent energy system capable of managing the fluctuations of renewable energy.

"Each web-connected ABB fast charger is capable of a full range of connectivity features, including remote assistance, management and servicing and smart software upgradeability," says Hans Streng SVP, GM EV charging infrastructure product group. "With the high share of intermittent renewable energy in the Danish electricity mix, smart charging becomes increasingly important. ABB's connected chargers are ready to be connected to any smart electricity distribution system or smart grid."

Related Content

  • March 23, 2018
    ABB adds AC Wallboxes to portfolio of charging solutions
    ABB has added alternative current (AC) Wallboxes to its portfolio of charging solutions. The systems can be installed in homes and businesses and are said to be ideally suited for companies that want to provide overnight charging facilities for clients that work in sectors such as hospitality. The products are manufactured with a robust all-weather enclosure for indoor and outdoor use and are available in different versions, offering 4.6 and 11 kW AC charging as well as 22 kW AC 3-phase charging. The
  • April 28, 2014
    Swarco expands Danish presence
    Swarco has expanded its presence in Denmark with the acquisition of Danish company technical Traffic Solutions (TTS), one of the country’s leading traffic control and intelligent transport systems companies.
  • December 14, 2020
    Boston releases EV roadmap 
    US city wants to have EV chargers in every neighbourhood by 2023
  • March 13, 2014
    Aberdeen opts for APT EV charging
    Aberdeen City Council in Scotland has chosen electric vehicle (EV) charging from APT Technologies to support its aim to reduce air and noise pollution through encouraging the use of more sustainable and quieter transport modes. The contract also includes a three-year maintenance package. The first installation saw eight double 7kW units, two wall-mounted 7kW units and one double mixer post with 7kW and 3kW power supplies installed into local authority premises to service fleet vehicles and give council e