Skip to main content

Denmark expands EV charging infrastructure

Denmark’s electric vehicle (EV) charging infrastructure is to be expanded with the installation of fifty smart DC fast chargers. Electric mobility operator Clever has chosen power and automation technology group ABB to supply and maintain the fast chargers throughout Denmark. The companies say the ABB Terra 51 chargers, which are to be installed at strategic locations in the country, are ideally suited for freeway driving and has the capacity to fast charge electric vehicles in a matter of thirty minutes.
November 22, 2012 Read time: 2 mins
Denmark’s electric vehicle (EV) charging infrastructure is to be expanded with the installation of fifty smart DC fast chargers. Electric mobility operator Clever has chosen power and automation technology group ABB to supply and maintain the fast chargers throughout Denmark.

The companies say the ABB Terra 51 chargers, which are to be installed at  strategic locations in the country, are ideally suited for freeway driving and has the capacity to fast charge electric vehicles in a matter of thirty minutes.

ABB web-connected fast chargers have the capacity to offer full range connectivity, remote assistance and software upgrading and are capable of being connected to electric distribution system or smart grid for effective and timely charging of electric vehicles.

The chargers have been specially chosen due to their reliability and higher level of uptime. The company is well versed in the demands for quick and efficient fast charging in the EV industry.

"We are delighted that we have signed an agreement with ABB. At Clever, the development of a smart EV charging network that is able to easily implement ABB's fast charging products, along with other suppliers, enables us to shortlist the right products at the right price; benefiting our customers," says Lars Bording, Clever's CEO.
Clever's network of DC fast chargers and AC chargers builds on Denmark's commitment to becoming independent of fossil fuels by 2050. The country will reach its ambitious goal by increasing energy efficiency and resource optimisation; by expanding the share of renewable energy from sources such as wind and biomass; and by driving the development of an intelligent energy system capable of managing the fluctuations of renewable energy.

"Each web-connected ABB fast charger is capable of a full range of connectivity features, including remote assistance, management and servicing and smart software upgradeability," says Hans Streng SVP, GM EV charging infrastructure product group. "With the high share of intermittent renewable energy in the Danish electricity mix, smart charging becomes increasingly important. ABB's connected chargers are ready to be connected to any smart electricity distribution system or smart grid."

Related Content

  • Denmark calls on Neology for LEZ
    March 22, 2021
    Neology's Clean Air as a Service portfolio is used by Danish road authority Sund & Baelt
  • Pod Point chosen to charge JLR’s I-Pace and PHEV range
    June 5, 2018
    UK- based company Pod Point can now install electric vehicle chargers at retailers and drivers’ homes for Jaguar Land Rover’s (JLR’s) full battery electric I-Pace and plug-in hybrid vehicles. The charge point provider was selected in a preferred supplier agreement. I-Pace has a 90kWh battery and a 298 range on the worldwide harmonised light vehicle test procedure cycle. Meanwhile, the Range Rover plug-in hybrid electric vehicle (PHEV) and Range Rover Sport PHEV have a range of 31 miles. The three
  • Building Europe’s roads for driverless age
    June 17, 2022
    Creating smart, co-operative road transport systems that harness the white heat of technology won’t be easy but a new document shows the way – Andrew Stone does some reading…
  • Global toll revenues $8.5bn while technology ‘battles’ continue
    April 9, 2014
    ABI Research’s Dominique Bonte talks to Jason Barnes about trends in tolling and how a wider appreciation of technology options is sorely needed. Global Electronic Toll Collection (ETC) solution revenues will grow to $8.5bn by 2018, with ETC becoming a main source of funding for both Intelligent Transport Systems (ITS) and Vehicle-to-X (V2X) cooperative infrastructures, according to a new report from ABI Research (Chart 1). But, says the report’s author, ABI Research vice president and practice director Dom