Skip to main content

Cubic wins Singapore fare collection project

A consortium of Cubic Corporation subsidiaries, Cubic Transportation Systems (Australia) and Cubic Technologies Singapore (C-Tech) has signed a contract with the Land Transport Authority (LTA) in Singapore to design and deliver automated fare collection equipment for the authority’s future Thomson-East Coast Line.
September 16, 2016 Read time: 1 min

A consortium of 378 Cubic Corporation subsidiaries, Cubic Transportation Systems (Australia) and Cubic Technologies Singapore (C-Tech) has signed a contract with the 918 Land Transport Authority (LTA) in Singapore to design and deliver automated fare collection equipment for the authority’s future Thomson-East Coast Line.

The contract, valued at US$35.5 million ($48.5 million Singapore) includes the design, development, test and integration with LTA’s current fare collection system.

Under the agreement, Cubic will deliver a full suite of devices for deployment in stations and operations depots.

The LTA’s Thomson-East Coast Line is under construction with the first stage to be launched in 2019 and the last stage to be completed in 2024.

For more information on companies in this article

Related Content

  • Cubic to supply electronic gating system for UK’s northern rail stations
    October 24, 2016
    Cubic Transportation Systems (CTS) has been awarded a UK train operator Northern to supply electronic gates at its stations. Cubic will install its next-generation electronic gating system at eight stations, for a total of 52 installed gates. The gates are equipped with ITSO-compliant smart card and barcode reading capabilities, in addition to accepting magnetic tickets. Gates have already been installed at two stations and the remaining six stations are scheduled to be completed by the end of March
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • How ITS helped Coachella get its groove back
    November 15, 2024
    California’s Coachella Valley attracts visitors to myriad music and sports events. But now an ambitious traffic management initiative aims to cut travel times and reduce emissions. Adam Hill talks to the engineers involved in the massive CV Sync project
  • Astaldi wins rail upgrade contract in Poland
    June 28, 2017
    The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).