Skip to main content

Cost of northern Colombia rail line US$1 billion says study

It would cost nearly US$1 billion to build a 260 kilometre rail line connecting cities in northern Colombia, according to a study by the Universidad del Norte in Barranquilla. The proposed rail corridor would link Santa Marta, Barranquilla and Cartagena, which are home to the three biggest ports on the country's Caribbean coast. The train would function as a mixed service line, transporting passengers as well as cargo. "Some details need to be worked out regarding funding sources, which depends more on the
March 18, 2015 Read time: 2 mins
It would cost nearly US$1 billion to build a 260 kilometre rail line connecting cities in northern Colombia, according to a study by the Universidad del Norte in Barranquilla.

The proposed rail corridor would link Santa Marta, Barranquilla and Cartagena, which are home to the three biggest ports on the country's Caribbean coast. The train would function as a mixed service line, transporting passengers as well as cargo.

"Some details need to be worked out regarding funding sources, which depends more on the political will" to carry out the project, local press quoted Víctor Cantillo Maza, a professor of engineering at Universidad del Norte, as saying. "The construction work could be completed in four years."

The Colombian train system has fallen into a state of disrepair due to decades of neglect.
The current government is working to revamp the existing rail lines, as a revitalised train network would help reduce the cost of transporting Colombian goods – particularly coal – to its ports. However, at the moment, most of the country's attention and resources are focused on developing its road infrastructure, namely the US$25 billion 4G highway initiative.

The entire Colombian rail system is nearly 2,000 kilometr4es, according to the transport ministry, though much of it remains out of service. Apart from a couple of small tourist lines, the network is primarily focused on cargo transport.

Related Content

  • June 20, 2014
    Colombia's growing airport concessions
    Colombia's three airport concessions have shown significant growth over the past ten years, each increasing passenger flow by over 200 per cent, figures from the country's civil aviation body show. Bogotá's El Dorado international airport, which became a concession in 2007, grew 235 per cent, passing from transporting 7 million passengers in 2003 to transporting 25 million in 2013. Meanwhile, Cartagena's Rafael Núñez airport grew 224 per cent from 1 million passengers in 2003 to 3.3 million in 2013.
  • July 25, 2014
    Bogota's metro tender delayed
    The tender for Bogota, Colombia’s decades-long and much-delayed first metro line has been pushed to the first quarter of 2015 following expansion of the US$3.6 billion project. The original project included the construction of the first line of Bogota’s 26.5 kilometre long metro, which would have 28 stations and be used by around 600,000 people a day. This is the first of four lines planned to be built in the next 30 years. The metro will complement the existing urban transport system by handling 50 p
  • November 7, 2014
    Chile launches ambitious transport plan
    In an effort to boost a weakening economy, Chilean President Michelle Bachelet has announced a nearly US$4.2 billion transport infrastructure plan, including one new metro line in Santiago, cable car systems in three other cities and rail projects. The plan includes US$1.9 billion in new concessions, with the expansion of public-private partnerships (PPPs) to the metro system and US$2.2 billion in works directly funded by the government. In Santiago, the program involves developing feasibility studie
  • January 26, 2012
    US incident management needs national standardisation
    I-95 Corridor Coalition's Tom Martin discusses the state of the art in incident management and what visitors to this year's ITS World Congress can expect of the first ever Emergency Responder-Incident Management Day. Developments in incident management are driven in the main by need. A bald statement, and one which holds no surprises, it nevertheless quantifies the evolutionary process within the I-95 Corridor Coalition over the last decade and more. Spread over 16 states from Maine to Florida, the Coalitio