Skip to main content

Cost effective EV fast charger from ABB

US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour. Easy
March 27, 2013 Read time: 2 mins
US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour.

Easy to install, easy to use, with optimal connectivity, the Terra SC is a web-connected charger that includes a full range of connectivity features, including remote assistance, management and servicing, with smart software upgradeability. Its key optional features include RFiD and PIN code authorization, as well as a web-based statistics module with data per user to support energy usage reporting. 4540 ABB’s connectivity suite supports all existing and future connection standards within the same network, and immediate “plug-and-play” functionality using the Open Charge Point Protocol (OCPP).

Using open standards, ABB DC chargers are able to integrate seamlessly into existing AC charging networks. “Electric vehicle service providers will find a great benefit in the easy integration of DC charging into their offering,” notes Cal Lankton, director of ABB’s electric vehicle charging infrastructure business for North America.

The Terra SC will be fully UL-listed, and comes standard with an outdoor-rated steel housing, a full-colour, eight inch, intuitive touch-screen user interface and smart connectivity. It is quick and easy to install at almost any location due to its ultra-thin design and simple floor and wall-mount connections.

For more information on companies in this article

Related Content

  • Kinetic unveils Detroit EV charging initiative
    October 1, 2019
    A collaboration led by DTE Energy called Project Kinetic has launched an initiative which allows drivers to charge electric vehicles (EVs) at Beacon Park in downtown Detroit, Michigan. DTE says the ChargeD initiative is offering access to four DC fast-charger stations. Project Kinetic – whose partners include the city of Detroit and General Motors – has a mission to identify solutions that address mobility challenges. Detroit’s director of sustainability Joel Howrani Heeres says: “ChargeD will allow r
  • Grant to fund commercialisation of PbC batteries for micro-hybrid vehicles
    May 25, 2012
    Axion Power International, the developer of advanced lead-¬carbon PbC batteries and energy storage systems, has been awarded a US$150,000 grant from the US Department of Energy (DoE) to fund a commercialisation plan for the use of its PbC batteries in a low-cost, high-efficiency dual battery architecture for micro-hybrid vehicles.
  • Breaking down silos with MyCity
    October 13, 2020
    McCain is putting its smart city commitment into action with the development of MyCity, an intelligent transportation and mobility platform that breaks down silos, creates networks of opportunity, and embraces the future of cloud solutions.
  • TfL appoints electric vehicle charge point operators
    April 27, 2017
    Transport for London (TfL) has appointed the Centrica Consortium, BluepointLondon, Chargemaster, Electricity Supply Board (ESB) and Fastned to provide the rapid charging points that the capital needs for electric vehicles. They will fund, maintain, operate and install the network. The first charge points are expected to be operational within a few months and will power vehicles in close to 30 minutes, compared with the three to four hours when using a standard unit. The initial aim is to see 75 charging poi