Skip to main content

Cost effective EV fast charger from ABB

US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour. Easy
March 27, 2013 Read time: 2 mins
US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour.

Easy to install, easy to use, with optimal connectivity, the Terra SC is a web-connected charger that includes a full range of connectivity features, including remote assistance, management and servicing, with smart software upgradeability. Its key optional features include RFiD and PIN code authorization, as well as a web-based statistics module with data per user to support energy usage reporting. 4540 ABB’s connectivity suite supports all existing and future connection standards within the same network, and immediate “plug-and-play” functionality using the Open Charge Point Protocol (OCPP).

Using open standards, ABB DC chargers are able to integrate seamlessly into existing AC charging networks. “Electric vehicle service providers will find a great benefit in the easy integration of DC charging into their offering,” notes Cal Lankton, director of ABB’s electric vehicle charging infrastructure business for North America.

The Terra SC will be fully UL-listed, and comes standard with an outdoor-rated steel housing, a full-colour, eight inch, intuitive touch-screen user interface and smart connectivity. It is quick and easy to install at almost any location due to its ultra-thin design and simple floor and wall-mount connections.

For more information on companies in this article

Related Content

  • Renesas launches driver safety system connectivity
    December 18, 2014
    Semiconductor solutions supplier Renesas Electronics’ new RH850/P1x-C series, a high-end version of the RH850/P1x series of 32-bit automotive microcontrollers (MCUs) has been designed with the development of self-driving car and other driver assistance systems in mind.
  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • California aims to generate electric power from traffic congestion
    April 20, 2017
    California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power. One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is