Skip to main content

Cost effective EV fast charger from ABB

US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour. Easy
March 27, 2013 Read time: 2 mins
US power and automation technology group says its latest fast charger, the Terra SC is a cost-effective direct-current (DC) charger specifically designed for convenient fast charging in commercial and office areas. It fully charges an electric vehicle (EV) in thirty to 120 minutes. The Terra SC is also ideal for people who want to keep driving but don’t necessarily need a full charge: it can charge the battery of currently available EVs from thirty per cent to eighty per cent in less than half an hour.

Easy to install, easy to use, with optimal connectivity, the Terra SC is a web-connected charger that includes a full range of connectivity features, including remote assistance, management and servicing, with smart software upgradeability. Its key optional features include RFiD and PIN code authorization, as well as a web-based statistics module with data per user to support energy usage reporting. 4540 ABB’s connectivity suite supports all existing and future connection standards within the same network, and immediate “plug-and-play” functionality using the Open Charge Point Protocol (OCPP).

Using open standards, ABB DC chargers are able to integrate seamlessly into existing AC charging networks. “Electric vehicle service providers will find a great benefit in the easy integration of DC charging into their offering,” notes Cal Lankton, director of ABB’s electric vehicle charging infrastructure business for North America.

The Terra SC will be fully UL-listed, and comes standard with an outdoor-rated steel housing, a full-colour, eight inch, intuitive touch-screen user interface and smart connectivity. It is quick and easy to install at almost any location due to its ultra-thin design and simple floor and wall-mount connections.

For more information on companies in this article

Related Content

  • Developing ‘next generation’ traffic control centre technology
    July 4, 2012
    The Rijkswaterstaat and Highways Agency have joined forces to investigate what the market can do to realise an idealistic vision for traffic control centre technology. Jon Masters reports One particular seminar session of the Intertraffic show in Amsterdam in March was notably over subscribed. So heavy was the press to attend that your author, making his way over late from another appointment, could not get in and found himself craning over other heads locked outside to overhear what was being said. The
  • Vienna’s first electric bus goes into operation
    October 31, 2012
    The first electric bus (eBus) to be used in Austria’s capital city of Vienna has been put into service by the municipal transport authority, Wiener Linien, the first operator in Europe to implement and integrate eBuses into scheduled service. Designed and developed by Siemens Rail Systems and bus manufacturer Rampini, the vehicle is the first of twelve with which Wiener Linien intends to move two of the city's bus services to electric power by the summer of 2013. The vehicle’s total energy requirement is st
  • EVgo launches mobile App for EV drivers to locate fast chargers.
    October 27, 2017
    EVgo in collaboration with technology solutions provider Driivz have launched the EVgo Mobile app allowing drivers of electric vehicles (EVs) to locate the nearest charge point in a US network of 980 DC Fast chargers. It allows card-free charging that initiates with a single swipe to the right and enables drivers to check charger availability. The app is available for IOS and Android devices.
  • SP Group expands Singapore EV chargers
    October 10, 2019
    SP Group is expanding its electric vehicle (EV) charger network in Singapore to 200 points, including 52 DC fast chargers. The company says the DC fast chargers will be able to charge an EV in 30 minutes in the Central Business District, Orchard shopping area, the island resort of Sentosa and a planning area in the east region called Paya Lebar. SP is hoping to install 1,000 charging points, of which will be 250 DC chargers by the end of 2020. SP’s head of strategic development, Goh Chee Kiong, sa