Skip to main content

Copenhagen light rail JV appointed

Copenhagen metro operator Metroselkabet has appointed Arup as part of a joint venture with Rambøll to develop the light rail on ring 3 for greater Copenhagen. The new light rail system includes a double track alignment of 27 kilometres and 27 stations with a rolling stock fleet of 27 light rail vehicles. This major project was planned to promote the use of public transport as well as encourage the urban development along the route and the passage across the city to avoid interchanging in the centre.
February 13, 2015 Read time: 2 mins

Copenhagen metro operator %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Metroselkabet About the Metro false http://intl.m.dk/#!/about+the+metro false false%> has appointed 7942 Arup as part of a joint venture with %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Ramb&#248;ll Visit Ramboll website false http://www.ramboll.com/ false false%> to develop the light rail on ring 3 for greater Copenhagen. The new light rail system includes a double track alignment of 27 kilometres and 27 stations with a rolling stock fleet of 27 light rail vehicles.

This major project was planned to promote the use of public transport as well as encourage the urban development along the route and the passage across the city to avoid interchanging in the centre.

The contract includes the design coordination and technical integration of the light rail systems, the design of the control and maintenance centre, traction power, ground borne noise and vibration modelling.

The line will follow the route of the ring 3 motorway road around the edge of Copenhagen, linking eleven municipalities, from Lundhofte in the north to Ishøj in the south. The new line will run a service of light rail vehicles every five minutes at peak times with a proposed journey time of fifty five minutes for the 27 kilometres.

For more information on companies in this article

Related Content

  • Association news around the globe
    March 15, 2016
    ITS New Mexico’s 2015 award has gone to the state’s Bernalillo County for establishing implementation criteria for adaptive traffic control and the installation of the state’s first system on Alameda Boulevard in Albuquerque. This uses Rhythm Engineering’s InSync Technology.
  • National Electronic Tolling Forum - call for abstracts now open
    September 30, 2015
    Australia’s National Electronic Tolling Forum (NeTC) 2016, hosted by ITS Australia, takes place in Brisbane on 25 and 26 May 2016. The program committee is now inviting speakers to submit abstracts for consideration for presentation. Submission topics include: Customer service and tolling; Tolling back office systems; Enforcement and collection; Recent and upcoming projects in Australia, New Zealand, Asia Pacific and Global; Big Data – Collection, Exchange and Privacy Issues; Deadline for submissions
  • Laser Technology showcases its measurement instruments in the field
    April 23, 2013
    Laser Technology is showcasing its line of laser-based measurement instruments, highlighting real-world profile and event trigger deployments in North Carolina, Texas, Colorado and South America. The measurement systems are being used in red light cameras, license plate recognition and vehicle classification applications.
  • NOCoE opens submissions for TSMO Awards
    September 10, 2019
    The US National Operations Center of Excellence (NOCoE) is accepting submissions for the second Transportation Systems Management and Operations (TSMO) Awards. The TSMO awards celebrate transportation management and operations that save lives, time and money. Judges will select a winner and runner-up from the following: •Best TSMO Project (Creative Solution) – A successful project, planning or response to a specific event, or other improvement for safety, congestion and/or travel time reliability. Thes