Skip to main content

Continued focus on industry improvement required to ensure ongoing safety of Britain’s railways

The UK Office of Rail and Road (ORR) has published its Annual Report on Railway Health and Safety performance which shows passengers on the mainline railway continued to be assured of a safe journey on Britain’s railways. However, ORR identifies challenges which must be carefully managed if passengers and workers are to continue to be protected. On the mainline railway, there were several significant structural and earthwork failures, any of which could have resulted in potentially serious train accidents.
July 21, 2017 Read time: 2 mins

The UK Office of Rail and Road (ORR) has published its Annual Report on Railway Health and Safety performance which shows passengers on the mainline railway continued to be assured of a safe journey on Britain’s railways.  However, ORR identifies challenges which must be carefully managed if passengers and workers are to continue to be protected.

On the mainline railway, there were several significant structural and earthwork failures, any of which could have resulted in potentially serious train accidents.  The report notes some sites are very vulnerable to failure in bad weather, especially cuttings and retaining walls. ORR is monitoring 5021 Network Rail to ensure lessons are learned from recent incidents and that the deferral of any renewals is managed safely.

ORR’s continuing campaign to persuade companies to incorporate ‘safety by design’ procedures has achieved real success on the Crossrail and High Speed 2 projects and is starting to be taken up among current railway operators.

Operational and technological developments are changing Britain’s railways and ORR is pressing the industry to adapt quickly to meet the health and safety challenges posed by those changes. ORR has published guidance intended to help companies meet health and safety requirements and is pleased to note that it’s Leading on Health and Safety on Britain’s Railways guidance, which commits firms to collaborate on resolving priority risk areas, is becoming widely adopted.

Progress has also been made on ORR’s occupational health programme, including securing agreement with the Rail Principal Contractors Group on the management of Hand Arm Vibration risks and producing a video stressing the importance of occupational health.

Related Content

  • March 20, 2020
    Coronavirus: World’s transit system moves into lockdown
    The threat of coronavirus is plunging the world’s transit systems into lockdown as ridership numbers dwindle and limited services become the norm.
  • December 4, 2012
    Success of London's Olympic public transport systems
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • September 15, 2023
    Software is at heart of safe vehicle connectivity, says Qt Group
    Connected vehicle safety isn’t just under threat from malicious actors exploiting code – it’s also about avoiding software faults that could result in harm to people, says Patrick Shelly of Qt Group
  • April 1, 2019
    Swarco: ‘Everyone’s running after buzzwords’
    The ITS world finds itself in a time of great change. Swarco’s Michael Schuch talks to Adam Hill about connectivity, the increasing importance of the end user – and why you shouldn’t leave your core business behind