Skip to main content

Construction starts on first section of San Diego’s downtown cycle path

Construction has started on the first phase of San Diego’s Downtown Mobility Plan to help improve safety for cyclists and scooter riders. The 9.3 mile section will feature two-way cycle tracks on major arteries and help provide safer passage from Balboa Park to the San Diego Convention Center. It will be painted green and be separated from vehicular traffic by parked cars, flex posts or grade variations. City mayor Kevin Faulconer says connecting popular destinations in downtown to surrounding neighbour
January 7, 2019 Read time: 2 mins

Construction has started on the first phase of San Diego’s Downtown Mobility Plan to help improve safety for cyclists and scooter riders.

The 9.3 mile section will feature two-way cycle tracks on major arteries and help provide safer passage from Balboa Park to the San Diego Convention Center. It will be painted green and be separated from vehicular traffic by parked cars, flex posts or grade variations.

City mayor Kevin Faulconer says connecting popular destinations in downtown to surrounding neighbourhoods is an important step in encouraging people to get out of their cars more often and providing safe paths of travel for everyone.

Three corridors will be redesigned to include cycle tracks. These include Beech Street, from Pacific Highway to Sixth Avenue; Sixth Avenue, from Beech Street to Harbor Drive; and J Street, from 1st Avenue to Park Boulevard.

Looking ahead, the second and third phases of the Downtown Mobility Plan will be completed over the next three years. There will be several primary paths of travel throughout the downtown area, including Pacific Highway, State Street, Third Avenue, Fourth Avenue, Fifth Avenue, Park Boulevard, Hawthorn Street, Grape Street, B Street, C Street and Broadway west of Third Avenue.

Related Content

  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • Uber clean-up - those all-important facts and figures
    September 11, 2020
    Ride-hailing giant says it can switch to all-electric vehicles 'in any major city' by 2030
  • Dubai trials autonomous vehicles
    November 16, 2016
    The Dubai Roads and Transport Authority (RTA), in collaboration with Dubai Properties, has recently begun the trial operation of autonomous vehicles, each capable of carrying ten passengers, within the Business Bay District over a 650 metre-long track. This follows the success of the first and second phases of the trial operation of smart vehicles in the Dubai World Trade Center and the Mohammed bin Rashid Boulevard. The electric-powered smart vehicle is designed to move within closed internal roads in a
  • New Port Mann Bridge opens to eight lanes of traffic
    December 6, 2012
    Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin