Skip to main content

Construction starts on first section of San Diego’s downtown cycle path

Construction has started on the first phase of San Diego’s Downtown Mobility Plan to help improve safety for cyclists and scooter riders. The 9.3 mile section will feature two-way cycle tracks on major arteries and help provide safer passage from Balboa Park to the San Diego Convention Center. It will be painted green and be separated from vehicular traffic by parked cars, flex posts or grade variations. City mayor Kevin Faulconer says connecting popular destinations in downtown to surrounding neighbour
January 7, 2019 Read time: 2 mins

Construction has started on the first phase of San Diego’s Downtown Mobility Plan to help improve safety for cyclists and scooter riders.

The 9.3 mile section will feature two-way cycle tracks on major arteries and help provide safer passage from Balboa Park to the San Diego Convention Center. It will be painted green and be separated from vehicular traffic by parked cars, flex posts or grade variations.

City mayor Kevin Faulconer says connecting popular destinations in downtown to surrounding neighbourhoods is an important step in encouraging people to get out of their cars more often and providing safe paths of travel for everyone.

Three corridors will be redesigned to include cycle tracks. These include Beech Street, from Pacific Highway to Sixth Avenue; Sixth Avenue, from Beech Street to Harbor Drive; and J Street, from 1st Avenue to Park Boulevard.

Looking ahead, the second and third phases of the Downtown Mobility Plan will be completed over the next three years. There will be several primary paths of travel throughout the downtown area, including Pacific Highway, State Street, Third Avenue, Fourth Avenue, Fifth Avenue, Park Boulevard, Hawthorn Street, Grape Street, B Street, C Street and Broadway west of Third Avenue.

Related Content

  • San Francisco launches congestion management strategy
    December 11, 2014
    San Francisco mayor Edwin M. Lee has launched the city’s congestion management strategy to improve traffic flow and safety, especially in the South of Market neighbourhood where construction and growth remain the highest in the City. The strategy outlines additional efforts the city could undertake, beyond traditional approaches such as the Interdepartmental Staff Committee on Traffic and Transportation (ISCOTT). These additional efforts include smarter traffic enforcement, better construction permitt
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • I-80 Smart Corridor sets the ITS standard for California's Bay Area
    March 23, 2015
    Colin Sowman looks at California’s ‘smartest’ road which will open this spring to counter congestion and accidents on one of the Bay Area’s busiest interstates. Interstate 80 (I-80) is one of the busiest roads in the San Francisco Bay area with up to 270,000 vehicles using the corridor every day. The section between the Carquinez Bridge in Crockett and the Bay Bridge not only suffers congestion during the working week but also at weekends. Traditional remedies such as building additional lanes (there are al
  • Seoul gears up for bike-only road
    September 15, 2020
    New route will connect to city-wide cycle rapid transit network next April