Skip to main content

Consortium wins Mexico rail project

A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
November 27, 2014 Read time: 1 min
A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway.

The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services.

The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio in Mexico City and Zinacantepec in Mexico state (Edomex). The line will have four stations and two main terminals, including a stop at Metepec, close to Toluca international airport. The journey will take 39 minutes and is expected to transport 270,000 passengers a day.

Related Content

  • Aecon consortium selected for Eglinton Crosstown light rail transit project
    June 11, 2015
    Crosslinx Transit Solutions, consisting of Aecon, ACS Infrastructure Canada, EllisDon, and SNC-Lavalin, has been selected by Metrolinx and Infrastructure Ontario as the preferred supplier for the development of the Eglinton Crosstown light rail transit project in Toronto.
  • GMV system upgrades Cyprus's buses to improve traffic conditions
    December 22, 2017
    Cyprus's Transport and communications minister, Marios Demetriadis, travelled onboard one of the country's modernized buses fitted with GMV's fleet-management system to provide riders with real-time, bus stop and status information and improve the region's public transport services. This equipment has been installed in two-thirds of the 790 vehicles and will include fleets from Nicosia and Limassol in December.
  • Cost of northern Colombia rail line US$1 billion says study
    March 18, 2015
    It would cost nearly US$1 billion to build a 260 kilometre rail line connecting cities in northern Colombia, according to a study by the Universidad del Norte in Barranquilla. The proposed rail corridor would link Santa Marta, Barranquilla and Cartagena, which are home to the three biggest ports on the country's Caribbean coast. The train would function as a mixed service line, transporting passengers as well as cargo. "Some details need to be worked out regarding funding sources, which depends more on the
  • Scania to test electric trucks and buses in real-life conditions
    June 9, 2015
    In February 2016, Scania will begin testing electric trucks as part of the Swedish Gävle Electric Road project, which will demonstrate and evaluate conductive technology, using electric transmission through overhead lines above vehicles equipped with a pantograph power collector. The Swedish Transport Administration has now approved support for the project, which is in line with the Government’s goal of an energy-efficient and fossil-free vehicle fleet by 2030. The project consists of about US$9.2 millio