Skip to main content

Consortium wins Mexico rail project

A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
November 27, 2014 Read time: 1 min
A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway.

The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services.

The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio in Mexico City and Zinacantepec in Mexico state (Edomex). The line will have four stations and two main terminals, including a stop at Metepec, close to Toluca international airport. The journey will take 39 minutes and is expected to transport 270,000 passengers a day.

Related Content

  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • STV selected to design Massachusetts rail extension
    May 10, 2018
    Transport design firm STV has been chosen as lead designer for the Massachusetts Bay Transportation Authority’s (MBTA’s) $1.3bn Green Line Light Rail Extension (GLX). MBTA expects the 4.3 mile expanded route to reduce up to 26,000 regional daily vehicle miles travelled, improving air quality and reducing congestion. Once completed, the increased line will provide commuters in Cambridge, Somerville and Medford with journeys to downtown Boston. Construction is expected to begin later this year, with the se
  • Data helps Ohio DoT get grant money
    January 25, 2022
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • Hong Kong’s rail terminus goes ahead
    October 5, 2012
    With a total area of over 380,000 square meters, the multi-storey West Kowloon rail terminus, the majority of it located underground, will be larger than most airport terminals, and capable of handling around 99,000 passengers per day. The first trains are expected to run from 2015. The Hong Kong section of the express rail link, operating at up to 200 km per hour, will connect Hong Kong with the capital Beijing over 2,000 kilometers away, passing via Shenzhen, Guangzhou and Wuhan.