Skip to main content

Consortium wins Mexico rail project

A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway. The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services. The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio
November 27, 2014 Read time: 1 min
A consortium led by Spanish engineering firm CAF and comprising partners Construcciones Ferrovías y Subsistemas, Thales, Corsan-Corvian Construcción, Isolux and Construcciones Urales has been awarded the US$993 million contract for the Mexico City-Toluca railway.

The contract involves the provision of electric trains, rail and communication infrastructure, ticketing facilities and associated services.

The trains will travel at speeds of up to 160km/h along the 57.7 kilometre route between Observatorio in Mexico City and Zinacantepec in Mexico state (Edomex). The line will have four stations and two main terminals, including a stop at Metepec, close to Toluca international airport. The journey will take 39 minutes and is expected to transport 270,000 passengers a day.

Related Content

  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.
  • JV selected for Perth’s Forrestfield-Airport Link
    February 23, 2016
    The Public Transport Authority of Western Australia has selected the Salini Impregilo - NRW Joint Venture, comprising Salini Impregilo and NRW Pty, as its preferred bidder to design, construct and maintain the Forrestfield-Airport Link. The US$1.5 billion state government-funded project is a new train line that will connect Forrestfield to the city, opening up Perth’s eastern suburbs to the rail network for the first time and giving Perth Airport users a travel option five minutes faster than by car.
  • Huawei develops the next generation of wireless communications
    October 25, 2024
    Huawei has developed and already deployed high-integrity and richly featured cellular communications solutions for the railway sector which are based on the new FRMCS standard and 4-5G technology
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b