Skip to main content

Consortium selected for Maryland LRT project

The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
March 3, 2016 Read time: 2 mins
The Purple Line Transit Partner consortium, comprising 2248 Fluor Enterprises, 7905 Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the 5629 Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA).

Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties.

The US$2 billion project will extend from Bethesda, Maryland in Montgomery County to New Carrollton, Maryland in Prince George’s County. This new line will provide connections to several existing transit providers and improve mobility to major economic and job centres, as well as the University of Maryland in College Park. The project is intended to support community revitalisation and transit-oriented development along the corridor.  

The Fluor-led design-build team, Purple Line Transit Constructors, comprises Fluor Enterprises, the Lane Construction Corporation and Traylor Bros and includes subcontractor 1677 Atkins North America as the lead designer. The team will begin design and construction later this year with passenger service scheduled for early 2022. Following construction, Purple Line Transit Operators, a Fluor-led team comprising Fluor Enterprises, Alternate Concept, and CAF USA will provide 30 years of operations and maintenance services.

For more information on companies in this article

Related Content

  • New transit centre for Rhode Island
    February 1, 2023
    Development will have space for bikes and is expected to serve three million users a year
  • Caltrans takes the long view of transport
    October 21, 2016
    Caltrans’ Malcolm Dougherty took time out of his schedule at ITS America 2016 in San Jose to talk to ITS International about current and future challenges. As director of California Department of Transportation (Caltrans) since mid-2012, many would say that Malcolm Dougherty has one of the best jobs in transportation. Caltrans is one of the most progressive and innovative transport authorities, implementing policies to encourage cycling, piloting new
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Qatar invests $70 billion to pave the way to world beating transportation
    July 26, 2013
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in