Skip to main content

Consortium selected for Maryland LRT project

The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
March 3, 2016 Read time: 2 mins
The Purple Line Transit Partner consortium, comprising 2248 Fluor Enterprises, 7905 Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the 5629 Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA).

Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties.

The US$2 billion project will extend from Bethesda, Maryland in Montgomery County to New Carrollton, Maryland in Prince George’s County. This new line will provide connections to several existing transit providers and improve mobility to major economic and job centres, as well as the University of Maryland in College Park. The project is intended to support community revitalisation and transit-oriented development along the corridor.  

The Fluor-led design-build team, Purple Line Transit Constructors, comprises Fluor Enterprises, the Lane Construction Corporation and Traylor Bros and includes subcontractor 1677 Atkins North America as the lead designer. The team will begin design and construction later this year with passenger service scheduled for early 2022. Following construction, Purple Line Transit Operators, a Fluor-led team comprising Fluor Enterprises, Alternate Concept, and CAF USA will provide 30 years of operations and maintenance services.

For more information on companies in this article

Related Content

  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin
  • ADB approves grant for BRT in Karachi
    July 23, 2019
    The Asian Development Bank (ADB) has approved a $235 million loan to help develop a bus rapid transit (BRT) system in Karachi, Pakistan. The project will deliver the 26km Bus Rapid Transit Line Red Line Corridor and associated facilities. More than 300,000 passengers per day are expected on the Red Line BRT routes. It will include the construction of 29 stations and dedicated lanes, a roadway with up to six lanes in each direction, on-street parking and green areas well as the installation of bicycl
  • Australia highway to receive smart tech 
    October 12, 2021
    Smart motorway tech will be installed between Pine River and Caloundra Road
  • The case for using toll revenues to fund Interstate improvements
    May 11, 2012
    High road toll increases threaten new regulation, but states should be free to use toll revenue for Interstate improvements. Bob Poole reports Large toll rate increases have been implemented recently by the Port Authority of New York and New Jersey, justified in part to help pay for its World Trade Center project. In response, a bill was introduced in Congress that would allow the Secretary of Transportation to regulate tolls on every bridge on the country’s Interstates and other federally aided highways. F