Skip to main content

Consortium selected for Maryland LRT project

The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
March 3, 2016 Read time: 2 mins
The Purple Line Transit Partner consortium, comprising 2248 Fluor Enterprises, 7905 Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the 5629 Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA).

Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties.

The US$2 billion project will extend from Bethesda, Maryland in Montgomery County to New Carrollton, Maryland in Prince George’s County. This new line will provide connections to several existing transit providers and improve mobility to major economic and job centres, as well as the University of Maryland in College Park. The project is intended to support community revitalisation and transit-oriented development along the corridor.  

The Fluor-led design-build team, Purple Line Transit Constructors, comprises Fluor Enterprises, the Lane Construction Corporation and Traylor Bros and includes subcontractor 1677 Atkins North America as the lead designer. The team will begin design and construction later this year with passenger service scheduled for early 2022. Following construction, Purple Line Transit Operators, a Fluor-led team comprising Fluor Enterprises, Alternate Concept, and CAF USA will provide 30 years of operations and maintenance services.

For more information on companies in this article

Related Content

  • Toll plaza conversion will reduce congestion on I-95
    April 17, 2012
    In an effort to reduce congestion in a busy corridor for motorists and commercial freight carriers, Delaware Department of Transportation (DelDOT) appointed TransCore as the lead integrator on a project to convert the Newark Toll Plaza on I-95, adding two new electronic highway speed lanes on both the north and south bound plazas. Plaza throughput is now about to jump from 250-300 transactions per lane per hour to an estimated 2,000. The US$32 million “shovel ready” project was fully funded through the Amer
  • Potential game-changing MoU on tolling and ITS market cooperation for North America
    February 2, 2012
    Kapsch TrafficCom IVHS Corporaton and Federal Signal Corporation have entered into a Memorandum of Understanding after substantial discussions during the past few months regarding ways in which the two organisations might cooperate and jointly pursue mutual business interests in North America.
  • Future traffic management needs new thinking, new technology
    January 23, 2012
    One of the biggest problems facing US ITS professionals, says Georgia DOT's Hugh Colton, is the constrained thinking which is sometimes forced upon those making procurement decisions. It is time, he says, to look again at how we do things. In the November/December 2010 edition of this journal, Pete Goldin interviewed Joseph Sussman, chairman of the US's ITS Program Advisory Committee. Amongst other observations that Sussman made was that, technologically, ITS in the US is 10 years behind that in the world-l
  • Hyperloop feasibility study confirmed for Kansas City
    February 2, 2018
    Black Veatch in partnership with Virgin Hyperloop One (VHO) and the University of Missouri System will conduct a feasibility study of an ultra-high-speed hyperloop route along I-70 in the state on behalf of The Missouri Hyperloop Coalition. The proposed route would connect a combined five million residents in Kansas City, Columbia and St. Louis with a journey time under 30-minutes. The study will analyse the technical alignment as well as the potential economic impact and benefits of integrating hyperloop