Skip to main content

Consortium named for Pennsylvania PPP bridge project

A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme
January 27, 2015 Read time: 1 min
A consortium comprising 59 HDR, 7975 Plenary Group, 7974 Walsh Group and 7973 Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US.

As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services.

The team will begin construction in summer 2015 and complete all bridge replacements by year-end 2017. The commonwealth will retain ownership of the bridges but the team will be responsible for maintaining each bridge for 25 years.

For more information on companies in this article

Related Content

  • Iteris deploys roadway sensors across Hawaii and Guam
    August 24, 2020
    Partnership will help remedy long-term infrastructure issues, firm says.
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • Cost benefit: just $25 boosts pedestrian safety in Florida
    April 29, 2019
    A relatively straightforward change to the way that pedestrians cross the street in a Florida city has made a significant safety improvement. And what’s more, it was cheap, finds David Crawford Installing a lead pedestrian interval (LPI) system at 25 central business district signalised intersections in the Florida city of Lakeland has cut numbers of incidents involving pedestrians by some 60% - at a cost of US$25 for 30 minutes' work, according to traffic operations manager Angelo Rao.
  • WiLAN completes acquisition of IRD, changes name to Quarterhill
    June 2, 2017
    WiLAN has completed its acquisition of International Road Dynamics (IRD) and will begin trading on 6 June 2017 as Quarterhill, as part of its plan to transition to a growth-oriented diversified investment holding company by acquiring businesses that will operate alongside the company's intellectual property licensing business.