Skip to main content

Consortium lands Mexico highway concession

A consortium led by Mota-Engil has won a tender for the construction and operation of a stretch of Mexico's Tuxpan-Tampico highway. The Tuxpan-Tampico highway links two of Mexico's busiest Gulf coast ports and will be the first project in the country to be developed under the public-private partnership (PPP) law's unsolicited proposal provision. The project involves the construction of a highway south of the city of Tuxpan, from the junction with the Tihuatlán-Tuxpan highway to the connection with the
October 1, 2014 Read time: 2 mins
A consortium led by Mota-Engil has won a tender for the construction and operation of a stretch of Mexico's Tuxpan-Tampico highway.

The Tuxpan-Tampico highway links two of Mexico's busiest Gulf coast ports and will be the first project in the country to be developed under the public-private partnership (PPP) law's unsolicited proposal provision.

The project involves the construction of a highway south of the city of Tuxpan, from the junction with the Tihuatlán-Tuxpan highway to the connection with the Tuxpan-Tampico federal highway in Tamaulipas.  Works will require an investment of US$475 million and includes building a 159 kilometre highway with a 12 metre wide cross section, two 3.5 metre traffic lanes and road shoulders, along with five bypass junctions and 60 structures.

The project, with anticipated traffic of 5,000 vehicles per day, aims to improve road connections between central Mexico and northeast states and is part of the 2013-2015 Infrastructure Investment Program launched by Mexican President Enrique Pena Nieto.

Mota-Engil will be required to build the highway's 107 kilometre Tuxpan-Ozuluama stretch and maintain and operate it for 30 years.

Related Content

  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • March 17, 2016
    ‘Free’ power for signs, shelters and so much more
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati
  • August 26, 2016
    Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab