Skip to main content

Consortium to build Finnish motorway

The Finnish Transport Agency has appointed a consortium of Meridiam Infrastructure and YIT Rakennus as the service provider which will build the E18 Hamina–Vaalimaa motorway in Finland on a public-private partnership (PPP) basis. Construction will commence in autumn 2015 and the entire motorway is estimated to be completed in 2018. The consortium will be responsible for financing of the project, as well as planning, construction and maintenance for a period of 20 years. The E18 Hamina–Vaalimaa project compr
March 4, 2015 Read time: 2 mins
RSSThe Finnish Transport Agency has appointed a consortium of 7905 Meridiam Infrastructure and YIT Rakennus as the service provider which will build the E18 Hamina–Vaalimaa motorway in Finland on a public-private partnership (PPP) basis.

Construction will commence in autumn 2015 and the entire motorway is estimated to be completed in 2018. The consortium will be responsible for financing of the project, as well as planning, construction and maintenance for a period of 20 years.

The E18 Hamina–Vaalimaa project comprises the building of about 32 kilometres of new motorway and related roads, together with a waiting area for lorries. Existing pedestrian and cycle lanes will be improved and additional lanes will be built, especially along the old main road parallel to the motorway.

"The Finnish Transport Agency received three good offers of high standard. The winning tender met the Finnish Transport Agency's expectations both in terms of price and quality. We can now confidently start finalising the contract with a professional and capable service provider", says project director Lars Westermark at the Finnish Transport Agency.

"The tendering process was a success, and both the market conditions and interest rate were favourable. Current estimates show that the reduced annual expenses can save the Finnish Transport Agency over US$72.5 million over a period of 20 years." The final contract price will not be determined until this summer, when the contract is signed.

For more information on companies in this article

Related Content

  • Egis, Systra to carry out design studies for Medina metro
    March 16, 2015
    The Medina Metro Development Authority (MMDA) has awarded Egis, in association with Systra, a contract to carry out the design studies for the future metro network in Medina. The contract covers three lines (green, blue, red) stretching a total of 95 kilometres, including 25 kilometres underground and 48 kilometres overhead. The project is part of an ambitious plan initiated over the past few years by Saudi Arabia to develop and modernise its transport infrastructure. As the second holy city in the country,
  • Alstom consortiums awarded contracts for Cairo metro line 3
    March 10, 2015
    Alstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million. Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operationa
  • Toll performance exceeds expectations, improves travel times
    January 30, 2012
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • Brazil-Spain group could lose highway contract
    April 10, 2015
    An engineering consortium made up of Brazil's Mendes Junior and Spain's Isolux Corsán could be stripped of its US$208 million contract to build part of the northern stretch of the Mario Covas beltway surrounding the city of São Paulo. The consortium, led by Mendes Junior, is having difficulty honouring commitments due to a lack of cash flow and, according to São Paulo state highway company Dersa, it is not completing works according to the contract schedule signed in January 2013, local paper Folha de Sã