Skip to main content

Consortium to build Denver’s north metro rail line

A consortium including Graham, Stantec, Parsons Brinckerhoff, Balfour Beatty and Hamon Constructors (GBBH) has been awarded a US$343 million contract by Denver’s Regional Transportation District (RTD) to design and build the north metro rail line. The North Metro project, part of RTD’s sprawling FasTracks transit network, is a proposed 18.4 mile electrified commuter rail line that will connect Denver and Adams County by serving Commerce City, Northglenn and Thornton. Construction begins in 2014 and t
November 28, 2013 Read time: 1 min
A consortium including Graham, Stantec, 4983 Parsons Brinckerhoff, 3902 Balfour Beatty and Hamon Constructors (GBBH) has been awarded a US$343 million contract by Denver’s Regional Transportation District (RTD) to design and build the north metro rail line.

The North Metro project, part of RTD’s sprawling FasTracks transit network, is a proposed 18.4 mile electrified commuter rail line that will connect Denver and Adams County by serving Commerce City, Northglenn and Thornton.

Construction begins in 2014 and the first phase is expected to be complete by January 2018.

Related Content

  • LA Airport Metro Connector breaks ground
    July 5, 2021
    Project includes electric bus charging stations and is scheduled for 2024 completion
  • Improve and increase mass transit systems to minimise congestion
    January 24, 2012
    Rather looking to solve congestion by spreading the load, perhaps we need to look at concentrating it. Michael L. Sena writes. We humans were made to walk and run at embarrassingly slow speeds by comparison with other, more fleet-footed organisms. The sea is not our natural habitat and we were definitely not designed to fly unaided. Nevertheless, humankind has evolved a method of living during the past century that is dependent on transporting its members over very long distances during relatively short per
  • Rapid growth of bus rapid transit schemes on US Pacific coast
    January 27, 2012
    This section pulls together all the multi-modal topics in each issue. Subject matter will include smartcards; ticketing and payment systems; passenger information systems; fleet management for buses, trains and light rail; park and ride systems; on-line access to real-time information via Internet portals
  • Strabag consortium awarded HS2 high speed rail civil engineering contract
    August 1, 2017
    The SCS consortium, comprising Strabag, Skanska and Costain has been awarded the main work civil contract packages for lots S1 and S2 of the UK’s new HS2 high-speed railway that will initially link London to Birmingham and later to Leeds and Manchester. The contract is divided into two stages. Stage 1 requires the contractor to design, plan and estimate the works within a period of 16 months, which will serve as the basis for determining the target price for stage 2, the actual construction phase.