Skip to main content

Connexionz awarded contract to connect multiple transit agencies across three States

Provider of smart transit innovations Connexionz has been awarded a contract to deliver multi-agency regional passenger information system to connect several transport networks across three US States. It will initially manage and support seven partner agency fleets, with potential to scale and link up to 18 separate transport operators across Washington, Oregon and Idaho. Called iTransit NM it is designed with the intention of enabling passengers convenient access to real-time information on all rural and
November 22, 2017 Read time: 2 mins

Provider of smart transit innovations Connexionz has been awarded a contract to deliver multi-agency regional passenger information system to connect several transport networks across three US States. It will initially manage and support seven partner agency fleets, with potential to scale and link up to 18 separate transport operators across Washington, Oregon and Idaho.

Called iTransit NM it is designed with the intention of enabling passengers convenient access to real-time information on all rural and intercity transit and transfer connections.

Valley Transit based in Washington is the lead agency in the contract. It wanted a solution that would provide a single point of entry for current riders and prospective customers to access relevant information for where they live and want to go. Accurate bus arrival prediction times would also enable passengers to minimize their time spent waiting at bus stops.

The contract includes the provision of on-board technologies for partner agencies with optional add-on services such as multimedia, next stop audio visual alerts, vehicle diagnostics, automatic passenger counting, farebox integration. Automatic vehicle location systems with covert alarms and audio/video capability will also be installed to allow dispatch centers to direct first-responders to the real-time location of the bus in the event of an emergency.

Development of the iTransitNW portal and its supporting smartphone app is expected to go live by mid-2018. Ongoing support and maintenance services including onsite support are also included, together with an extended 3-year warranty period for all software and hardware.

Rhod Pickavance, Connexionz chief executive officer, said: “The solution is based on the TransitManager ITS suite. However, instead of managing just one agency network, the iTransitNW system will manage multiple networks across a wide geographical area. Live data feeds from multiple regional transit operators across the three US states will be captured and shared on both a website and a smartphone app, enabling riders to see all the connecting rural and intercity public transport services in the region.”

Related Content

  • Developing integrated transport networks
    September 20, 2012
    A major initiative in managing numerous transport networks as a single system has moved into a significant phase with design of sophisticated new ITS systems. Jon Masters reports. Detailed design work is under way on two pilot projects pursuing a common principle – that transportation can be made more efficient or effective if the various networks and modes of travel are managed as a whole system. This is the central tenet of the US Department of Transportation’s (USDOT) Integrated Corridor Management (ICM)
  • CRASH Predicts ‘unpredictable’ in traffic incidents
    November 11, 2015
    Road crashes are not as random as they may appear and analysing data can reveal patterns that can help various authorities target their resources more accurately. David Crawford reports. Figures from the US National Highway Traffic Safety Administration (NHTSA) show that in 2013 there were 32,719 people killed on American roads and 2.31 million injured. While these form part of an overall 25% drop over the decade from 2004, US Transportation Secretary Anthony Foxx continues to stress that reaching the procl
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • IRD awarded Idaho weigh in motion contract
    March 22, 2016
    The Idaho Transportation Department (ITD) in the US has awarded International Road Dynamics (IRD) a US$2,623,703 contract to supply and install a two-sided mainline weigh-in-motion (WIM) and electronic pre-clearance system on Interstate 15 at the Inkom Port of Entry. The contract includes a two-year equipment, software, and database maintenance provision to commence upon completion of the system's installation. This system will weigh and measure commercial vehicles at highway speeds upstream of the weigh