Skip to main content

Colorado launch plan to support EVs on state highways

John Hickenlooper, governor of Colorado, has announced the launch of the Colorado Electric Vehicle (EV) Plan to support EV infrastructure along the Western state’s corridors. The project aims to lay out goals to accelerate the adoption of these vehicles and has been delivered on a directive set forth in the July 2017 Executive order, Supporting Clean Energy Transition. The plan has been developed in partnership with the Colorado Energy Office, Regional Air Quality Council, Colorado Department of Public
January 30, 2018 Read time: 2 mins

John Hickenlooper, governor of Colorado, has announced the launch of the Colorado Electric Vehicle (EV) Plan to support EV infrastructure along the Western state’s corridors. The project aims to lay out goals to accelerate the adoption of these vehicles and has been delivered on a directive set forth in the July 2017 Executive order, Supporting Clean Energy Transition.

The plan has been developed in partnership with the Colorado Energy Office, Regional Air Quality Council, Colorado Department of Public Health and Environment and 5701 Colorado Department of Transportation. The agencies and council undertook a stakeholder engagement process with utilities, government entities, non-governmental organizations, and industry representatives.

This project involves five key action areas including creating strategies and partnerships to build out EV fast-charging corridors; coordinating with regional EV West memorandum of understanding (MoU) states on intermountain electric corridor and; developing strategic partnerships with utilities, local governments and stakeholders. In addition, it features updating signage and wayfinding requirements to include EV fast-charging and ensuring economic and tourism benefits to increase access for all Coloradans.

In October last year, governors of eight Western states signed the Regional Electric Vehicle West MoU for collaboration in developing an Intermountain West Electric Corridor. Interstates 70, 76 and 25 are included under Colorado’s commitment to the REV West plan.

Hickenlooper, said: “The Colorado EV Plan serves as a roadmap to build out a fast-charging network, giving Coloradans the ability to travel anywhere in the state in an EV. The plan includes a set of goals and strategies that ensure Colorado continues leading in adoption of EVs and leverages the economic development and tourism benefits.”

Related Content

  • November 10, 2017
    IBTTA’s Jones sees turbulent times and a bright future for tolling
    Colin Sowman talks to IBTTA’s Pat Jones about the future of tolling in a fast-changing world. Pat Jones may have been executive director and CEO of the International Bridge, Tunnel and Turnpike Association (IBTTA) for 15 years but in his words: “Never before have I seen so much change coming so fast in the transportation and tolling industry.” Amidst all this change, tolling companies are asked to provide funding for roadway building or improvements which will be repaid for over, say, a 30-year concess
  • April 19, 2012
    Another section of West Coast Green Highway EV charging infrastructure announced
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • August 19, 2024
    USDoT releases V2X roll-out roadmap
    Hope is that tech will reduce "crisis of US roadway deaths" which sees 40,000 fatalities a year
  • December 19, 2017
    USDoT pilots show win-win potential for connected vehicles
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.