Skip to main content

Colorado congestion cure from Daktronics

Daktronics is here at ITS America 2016 San Jose to highlight an impressive array of dynamic message signs (DMS) and an equally impressive recent deployment. Ski traffic congestion in Colorado had become extremely challenging for Colorado DoT with traffic rushing out to the slopes on Fridays and hurrying home on Sundays. Rather than the time and cost of building a whole new road to keep travellers moving, CDoT brought an economical solution to life: the I-70 Mountain Express Lane.
June 14, 2016 Read time: 2 mins
Jason Morrison of Daktronics

32 Daktronics is here at ITS America 2016 San Jose to highlight an impressive array of dynamic message signs (DMS) and an equally impressive recent deployment. Ski traffic congestion in Colorado had become extremely challenging for Colorado DoT with traffic rushing out to the slopes on Fridays and hurrying home on Sundays. Rather than the time and cost of building a whole new road to keep travellers moving, CDoT brought an economical solution to life: the I-70 Mountain Express Lane.

In a March 28, 2016 press release, Shailen Bhatt, CDoT Executive Director stated, “We know from experience that we can’t build our way out of congestion.”

A 13-mile stretch between Empire and Idaho Springs employs a shoulder lane for emergencies in the offseason that doubles as an Express lane during the peak travel season. Twenty-three Daktronics Vanguard displays alert drivers to lane status, toll rates, speed limits and safety information such as rock slides and accidents. Dynamic pricing determines the toll that drivers pay to use the lane, which can cut their drive time by 30 minutes.

The results have been extremely impressive: On April 3, 2016, travel speeds were 55 mph in the Express Lane and 40 mph in the general purpose lanes. Traffic in previous years crawled at 5-10 mph. Winter season throughput increased by 15% while peak day throughput increased by 5,800 vehicles. General purpose lane travel times improved by 18% during peak periods and corridor incidents were down by 15%. On Martin Luther King, Jr. Day, travel times for all lanes were reduced by up to 52% compared to 2012.

Matt Dunscomb, senior project manager for the roadway’s electrical contractor, explained that “Reliability was 100% the biggest factor in choosing a subcontractor. Daktronics is always a frontrunner with quality products. If something doesn’t work, they’re very responsive to do the right thing and get it fixed.”

For more information on companies in this article

Related Content

  • ITS America 2021: best of both worlds
    April 29, 2021
    ITS America’s rearranged Annual Meeting will take place in Charlotte, North Carolina, in early December. It is going to be Covid-safe and full of great content – both in-person and online
  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • Amazon keeps its head in the cloud
    December 17, 2021
    The days of Amazon just selling books may be long, long gone – but Randy Iwasaki of Amazon Web Services tells Adam Hill why the ability to tell stories still has an important place in a highly technical transport environment
  • 495 Express Lanes speed limit increased
    June 25, 2013
    Drivers using the 495 Express Lanes high occupancy toll road in north Virginia will benefit from the announcement that the speed limit is to be increased 65 miles per hour. The speed increase follows extensive safety studies and will help drivers save even more time when travelling on the Capital Beltway. The speed limit on the mainline Beltway lanes will remain at 55 mph. The 495 Express Lanes operate 24 hours a day, seven days a week. Dynamic pricing based on real-time traffic conditions manages the de