Skip to main content

Colorado congestion cure from Daktronics

Daktronics is here at ITS America 2016 San Jose to highlight an impressive array of dynamic message signs (DMS) and an equally impressive recent deployment. Ski traffic congestion in Colorado had become extremely challenging for Colorado DoT with traffic rushing out to the slopes on Fridays and hurrying home on Sundays. Rather than the time and cost of building a whole new road to keep travellers moving, CDoT brought an economical solution to life: the I-70 Mountain Express Lane.
June 14, 2016 Read time: 2 mins
Jason Morrison of Daktronics

32 Daktronics is here at ITS America 2016 San Jose to highlight an impressive array of dynamic message signs (DMS) and an equally impressive recent deployment. Ski traffic congestion in Colorado had become extremely challenging for Colorado DoT with traffic rushing out to the slopes on Fridays and hurrying home on Sundays. Rather than the time and cost of building a whole new road to keep travellers moving, CDoT brought an economical solution to life: the I-70 Mountain Express Lane.

In a March 28, 2016 press release, Shailen Bhatt, CDoT Executive Director stated, “We know from experience that we can’t build our way out of congestion.”

A 13-mile stretch between Empire and Idaho Springs employs a shoulder lane for emergencies in the offseason that doubles as an Express lane during the peak travel season. Twenty-three Daktronics Vanguard displays alert drivers to lane status, toll rates, speed limits and safety information such as rock slides and accidents. Dynamic pricing determines the toll that drivers pay to use the lane, which can cut their drive time by 30 minutes.

The results have been extremely impressive: On April 3, 2016, travel speeds were 55 mph in the Express Lane and 40 mph in the general purpose lanes. Traffic in previous years crawled at 5-10 mph. Winter season throughput increased by 15% while peak day throughput increased by 5,800 vehicles. General purpose lane travel times improved by 18% during peak periods and corridor incidents were down by 15%. On Martin Luther King, Jr. Day, travel times for all lanes were reduced by up to 52% compared to 2012.

Matt Dunscomb, senior project manager for the roadway’s electrical contractor, explained that “Reliability was 100% the biggest factor in choosing a subcontractor. Daktronics is always a frontrunner with quality products. If something doesn’t work, they’re very responsive to do the right thing and get it fixed.”

Related Content

  • January 12, 2016
    Here and CDOT to partner on US RoadX connected vehicle project
    The Colorado Department of Transportation (CDOT) and mapping and location technology specialist Here are to partner in the first cellular network-based connected vehicle alert system in North America.
  • May 19, 2017
    Comprehensive communications combats tolling resistance
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • May 11, 2017
    Pricing practise for HOT lane operation
    Timothy Compston weighs up the critical elements that keep the wheels of dynamic pricing schemes turning in today's high-occupancy toll (HOT) lanes. In the drive towards smarter tolling it is perhaps not surprising that sophisticated pricing algorithms are being rolled out to better reflect supply and demand on the roadway. This is the case with high-occupancy toll (HOT) lanes which a growing number of DoTs are seeing as a way of smoothing the operation of their existing, and planned, freeway infrastructure
  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was