Skip to main content

Colombia's growing airport concessions

Colombia's three airport concessions have shown significant growth over the past ten years, each increasing passenger flow by over 200 per cent, figures from the country's civil aviation body show. Bogotá's El Dorado international airport, which became a concession in 2007, grew 235 per cent, passing from transporting 7 million passengers in 2003 to transporting 25 million in 2013. Meanwhile, Cartagena's Rafael Núñez airport grew 224 per cent from 1 million passengers in 2003 to 3.3 million in 2013.
June 20, 2014 Read time: 2 mins
Colombia's three airport concessions have shown significant growth over the past  ten years, each increasing passenger flow by over 200 per cent, figures from the country's civil aviation body show.

Bogotá's El Dorado international airport, which became a concession in 2007, grew 235 per cent, passing from transporting 7 million passengers in 2003 to transporting 25 million in 2013. Meanwhile, Cartagena's Rafael Núñez airport grew 224 per cent from 1 million passengers in 2003 to 3.3 million in 2013.

Finally, although the concession packet for the six airports in Colombia's north-eastern region was awarded later, in 2010, the airports have collectively also increased by over 200 per cent, up more than 4 million passengers.

In addition, Colombia's national infrastructure agency ANI is also planning to launch an additional two airport tenders totalling US$300 million in July. The concessions would be for the expansion, operation and maintenance of airports serving the cities of Barranquilla, Neiva, Armenia and Popayán. One tender is for Barranquilla's Ernesto Cortissoz airport, while the other involves the remaining three terminals.

The concession could result in a 3.5 million increase in passenger traffic, according to estimates.

Related Content

  • November 7, 2013
    Tech combo used to target overweight vehicles
    UK enforcement agency VOSA is using a combination of ANPR and weigh-in-motion technology to detect and target overweight trucks on some of the busiest motorways. Overloaded vehicles pose a potential danger to drivers, other road users and pedestrians.
  • January 30, 2012
    Bus service data, better journey planning, better information
    Chris Gibbard and Paul Drummond of Transport Direct on developments in Great Britain in the electronic transfer of bus service data. Great Britain has a dynamic bus market which permits a bus operator to initiate or alter commercial routes by giving a minimum of eight weeks' notice to a registrar (the Traffic Commissioner). A Local Transport Authority (LTA) neither specifies nor determines such services. In addition to commercial bus routes, an LTA will tender and contract for the operation of those additio
  • July 29, 2013
    Asian high speed rail link tender expected late 2014
    Officially launched in February 2013, tenders for the high-speed rail link project between Kuala Lumpur and Singapore will be received towards the end of 2014, Mohd Nur Kamal, the CEO of Malaysia's Land Public Transport Commission (SPAD) has announced. Although the two governments continue to work on technical details and feasibility studies, various parties have already voiced an interest. The railway, which will connect the two countries at speeds exceeding 300 km/h, will reduce the journey time between t
  • January 25, 2012
    Increasing and improving disabled access to public transport
    An overview of European efforts to increase disabled access to public transport, by David Crawford