Skip to main content

Colombia seeks expressions of interest for Bogotá LRT

Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
December 15, 2014 Read time: 1 min
Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project.

The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá.

A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million passengers a year are expected to travel along the corridor.

Construction of the public-private partnership project is forecast to take 36 months, with the system estimated to be operational by 2018.

Related Content

  • Fluor: here's how to fix US infrastructure
    June 14, 2018
    US president Donald Trump’s comments about the country’s ‘crumbling infrastructure’ led many in the ITS sector to spot an opportunity to help with other solutions. David Seaton of Fluor ponders the scale of what’s required and considers some projects which have boosted mobility We can no longer wait for future generations to address this nation’s crumbling infrastructure. We need to act now. The problem is substantial, to say the least. The American Society of Civil Engineers predicts that failing to clo
  • Imperatives to shape extended mobility ecosystems of tomorrow
    April 10, 2014
    New survey shows cities ill prepared to meet the increasing demand for urban mobility. Most of the world’s cities are ill-equipped to cope with the predicted increase in demands on urban travel – that is the stark finding of the second ‘Future of Urban Mobility’ study carried out by global management consultancy Arthur D. Little. Compiled in association with the International Association of Public Transport (UITP), the survey examines and rates urban mobility in 84 cities worldwide against an extended set o
  • The bottom line - US surface transportation system needs major investment
    December 12, 2014
    The 2015 Bottom Line Report on transportation investment needs, released by the American Association of State Highway and Transportation Officials and the American Public Transportation Association, estimates that to meet current demand it will require an annual capital investment over six years by all levels of government in the amount of $120 billion in the nation’s highway and bridge network and US$43 billion in America’s public transportation infrastructure. To meet the combined surface transportation
  • Adaptive traffic control drives financial benefits
    July 24, 2012
    Prof. Klaus Banse, President of ITS Colombia and Ing. Robert Miranda, Head of the Traffic Management and Control System of Cartagena de Indias, Columbia, outline early cost benefits of an adaptive traffic control system. At the beginning of this year, Cartagena de Indias, located on the north coast of Colombia in the Caribbean, implemented a new adaptive traffic control system on 52 intersections with an investment of US$4.5 million.